Top-rated pole barn builders.

Get matched with top pole barn builders in Holt, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Holt, MO?

Select your specific project to find the pro for you.

Find Pole barn builders in Holt

Avatar for Nathan's Handyman Service
Nathan's Handyman Service
5.0(
7
)
Shed, Barn or Playhouse - Repair

Serving Holt, MO and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Warranties offered

"Brian was my handyman and is now my favorite handyman! Lol. He is a nice, sweet and efficient builder. He got my bed built in like 2 1/2 hours. I was so happy. I would definitely recommend these guys. I know this isn’t a good picture of my bed, but I wouldn’t even have a picture if it wasn’t for Brian. THANK YOU, BRIAN!!!!"
Handyman Services Project
Handyman Services Project
1 neighbors recently requested a quote
Recommended by71%of homeowners
Avatar for ASE
ASE
5.0(
1
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Holt, MO and surrounding areas

Approved

In business since 2017

Free estimates

Small jobs welcome

"Excellent service! The contractor did a fantastic job hauling away tree debris from my property. He was professional, hardworking, and completed the job quickly and efficiently. The area was left clean, and the price was fair. I highly recommend his services and would definitely hire him again."
Lawn
Field Clearing
28 neighbors recently requested a quote
Avatar for Cross and Hammer
Cross and Hammer
New to Angi
Shed, Barn or Playhouse - Build

Serving Holt, MO and surrounding areas

Approved

Small jobs welcome

Been in the handyman field for a while with some experience in deck building, siding, trim(interior and exterior), backsplash and tile work as well. Ive done some plumbing and garage door services and now for full time I build high end metal building! Quality and ingenuity is always in mind so you or the next customer loves their long term project!

Tiles in place and ready for grout. Adjustable fixtures were put in to maintain proper spacing with the new thicker backsplash
Mosaic kitchen tile
Mosaic kitchen tile
Decks
Decks

+6

Avatar for ALL SEASONS OUTDOOR STRUCTURES AND REMODELING, LLC
ALL SEASONS OUTDOOR STRUCTURES AND REMODELING, LLC
5.0(
14
)
Shed, Barn or Playhouse - BuildShed, Barn or Playhouse - Repair

Serving Holt, MO and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I hired Luke to build us a new deck from the ground up Luke went above and beyond the deck turned out beautiful. He had great ideas for improving my vision. Luke was punctual, hard-working and courteous. The whole project from start to finish went very smoothly. I couldn’t have asked for a better build or builder thanks again, Luke."
pavillion
covered deck
covered deck
covered deck
covered deck

+17

Response time9 hrs
Response rate100%
Avatar for Around The House
Around The House
4.6(
25
)
Shed, Barn or Playhouse - Repair

Serving Holt, MO and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"AWESOME!!!  Jeff's work is superb.  He was on time and worked diligently.  He kept the worksite as neat and organized as possible. Since my job was not clearly defined, I just ended up hiring him on an hourly basis.  This is the first time that I hired someone on a hourly basis where I felt like I really got my money's worth.  I highly recommend him and will definitely use him again.
"
Exterior Repair
Interior Work
Exterior Door
Recommended by100%of homeowners
Avatar for White Dog Painting & Gutters
White Dog Painting & Gutters
4.6(
143
)
Shed, Barn or Playhouse - Repair

Serving Holt, MO and surrounding areas

In business since 1988

Free estimates

Emergency services offered

"Ron Scott, the owner, came out in mid-September and viewed the home. He made several good suggestions about making carpentry repairs that would prevent damage and wood rot in future. Ron also pointed out the siding on the front showed water damage from age and suggested replacing siding on the garage. He promised an estimate within and day on the painting and siding and the garage with Hardy board, and complete the estimate of the carpentry, wood/trim replacement after his crew inspected. An estimate arrived by email late that evening. It was reasonable and including the specific repairs and adjustments he had recommended. He said it might be 6 weeks before he could get a crew out. Fortunately, White Dog called about a week later and said they could send a crew out earlier, if it was convenient. A four person crew showed up in early October and began work removing the damaged siding, rotted wood and preparing the rest of the house for painting. Tony and his three crew members showed up promptly at 9AM every weekday and left around 6PM. Ron came out on the 2nd day and went over the carpentry and repair estimate. He also suggested that replacement of the lap siding on the garage, in time, might not match up well with the rest of the front of the home and putting Hardy board siding across the whole of the front might be an option and gave me an additional quote for the whole front. I agreed to the carpentry and replacing the entire front with Hardy board lap siding. Work continued 6 workdays to completion. It was necessary for me to communicate the specifics of the adjustments and repairs to the gutters and other carpentry items mentioned in the contract but not communicated clearly to the crew. I had noticed that a different brand of Hardy board had been used to finish up the small pieces at the end of the job. It appeared they were damaged to some extent, as if used before. I mentioned this to the crew prior to priming the house and again to Noah Scott, at the final walk inspection. They did not admit not all the siding was new, nor did they deny it either. Ron was particularly sensitive when I first mentioned this in the review and insisted all the siding was new, even though different manufacturers. I suggested producing the invoices showing 2 different purchases of Hardy board. Still waiting to see the invoices. The preparation, caulking, and prime/final coats were expertly done. The house looked brand new. I paid the extra $350 to have them use Sherwin Williams' Duration paint. The last paint job was done with Duration and it held up exceptionally well. As I went back to wash the windows, spruce up the outside, I found that some of the wood trim replaced had the screws driven into the widow tracks, instead of the widow frame. Also, storm widows and doors had not been reinstalled with more air gap than I would have preferred. Two outside lights did not work and it was necessary to reinstall them. I had made White Dog aware of all of these, the whole crew came out as quickly as weather would permit and reattached some of the trim properly and caulked and repainted. I repaired the other items myself. Additionally, White Dog offered to paint an interior room or other handyman work to compensate for the inconvenience."
Additional Photos
Additional Photos
Additional Photos
Interior Design
Recommended by95%of homeowners
...
Showing 1-10 of 93
Pole Barn Builders questions, answered by experts

The most common slope, or roof pitch, for a shed is 4:12 or four inches of height for every horizontal foot. For areas that experience heavy snow loads, a steeper roof of 6:12 or 9:12 is best. 

Your chicken coop needs to be off the ground to protect your chickens and avoid problems brought on by flooding, mud, and moisture. If you can't locate a high area to build the coop, you should build an elevated coop to ensure it stays dry. 

In the U.S., original and converted carriage houses are most often found in New England, New York, and other parts of the Northeast. New construction carriage houses can be found across the country, and are often added to properties with Colonial-style homes for additional living, storage, or work space, although they can be found in many different styles.

There's no simple answer to which is less costly: wood or metal-framed homes. In most cases, metal building components cost more than wooden ones, while entire metal buildings cost less than wooden versions. However, regardless of the exterior framing or structure, each must meet similar building codes. This means that the costs are about the same, even considering that wood will require more maintenance than metal over time.

The time it takes to build a shed heavily depends on the type of shed you buy. A prefab shed can be built in 4 to 8 hours, while a custom shed will be built off-site over the span of 2 to 5 days. It then takes a few hours, depending on the location, to move the finished shed to its final location.

The Holt, MO homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.