"Work was done well. Old deck removed and hauled away. New deck work was completed in a timely manner. Workers were respectful and kept things in order."
"Replaced all of our lights and ceiling fans, he does almost anything. Most recently, he stained our deck. He also repaired drawers and installed outdoor security cameras. Literally, regarding property improvements, there isn't much he cannot do! I recommend him all the time!"
"Milholland Contracting is very professional. Milholland Contractingâ s craftsmanship is top notch. Milholland Contracting has completed several projects for me over the years (cabinets, closet, pocket door) and I am very pleased with the outcome each time!"
"Farid did an excellent job repairing and replacing the damaged floor joists, deck flooring, and railing. The work was completed professionally, on time, and with great attention to detail. He was courteous, hardworking, and kept the work area clean throughout the project. Their pricing was fair and competitive, providing excellent value for the quality of workmanship delivered. The deck is now sturdy, safe, and looks fantastic with its new flooring and railing. I highly recommend Farid Fencing for quality workmanship, fair pricing, and reliable service."
My name is Jordan, and I’ve been doing asphalt for 15 years! I specialize in anything that has asphalt. Everything from full depth repairs, patching, seal coating, grading for a new build, driveways and seal coating. I pride myself in giving you quality work that makes you feel happy about your investment.
"We hired Aaron to replace our staircase which was original to the house. He replace the railings, wrapped the newel posts, added new spindles, and replaced the skirts. He was timely with his communication and showed up when he said he would. He cleaned up after himself and left us impressed! We love the work he did and will be sure to reach out in the future should we need carpentry work."
"First let it be known that I have waited a period of time after completion as I wanted this to be a honest not a plain and acirc;??P***** Offand acirc;?? review. Details: my start date was set for the contractor to be out first thing on 5/28/14. I took the week off from work to be sure that anything that was needed to be done by me could be handled immediately. When the sub-contractor (not verified subs but they kept taking phone calls for what sounded like non-Siding Repair Systems jobs) on my time. They did not arrive and I called a bit frustrated that no one showed and Cory the and acirc;??Bossand acirc;?? said the current job they were on they ran into a mold problem. I told them that they could come out the next day then and was told they would be there. I believe I should have at least received a phone call explaining they could not make it and to ask for a re-schedule. That did not happen on day 2 or day 3. I was asked if they could pay the installer double time and if I could be there on Sunday. I was OK with that and they did not show at the arranged time of 9-10 oand acirc;??clock. So I called Cory yet again (about 5 times now making this same call) and he did not have much to say but he would call them. Finally they showed for the first time walked around the house a bit and left saying they were to get the materials that should have been on their truck before they showed up 3 hours late. When they got back and started removing the old siding they left the house open to the elements and it rained heavily that night. Next day (Monday) they did not show ti Mid-afternoon again and that was the way the whole thing was. They did a couple hours and left. However my wife works a big box hardware store and she Note that the siding they were putting up did not look like the James Hardie siding we were paying for. I challenged them on that and when they looked they realized that they made a mistake. Now I thought to myself if it would not have been for the observation of my wife they would have completely sided the house with the wrong material and charged us for the Hardie siding and if we were normal consumers we would have never known. Makes one wonder if that is a new and acirc;??bait and switch and acirc;?? tactic? Then they had to go get the Hardie Siding and the boss Cory calls now that they were caught with the wrong stuff 50% on the walls and asks if I would be willing to take the lesser siding at a lesser price. I said no as I and acirc;??trusted themand acirc;?? to do the right thing. Finally after 3 more days of being late and 3 strong rain storms the job was done. It does look good BTW canand acirc;??t fault that I guess. To end the story I have to make 2 more calls for them to get the trash completely removed and that was only after I threaten them by having American Express withhold payment. I would not recommend this outfit to anyone. I lost 24 hours of vacation due to them not showing up as promised, the trash left around my house, and the and acirc;??presumedand acirc;?? mistake of the wrong siding. I read all the previous reviews on Angieand acirc;??s List and based on my experience I tend to believe they are forgeries. BEWARE is my only warning!!!!!"
"I was most impressed that they showed up when they said they would. They did not expect payment until the job was completed at the end of the week. No job was too big or small."
The least expensive way to build a pool deck is with concrete deck blocks, pressure-treated lumber, and the appropriate hardware for hanging joists and securing deck boards. With these basic yet durable deck materials, you'll have a pool deck that's built to last without the high price tag. You should also stain or seal the deck to protect it against the elements.
You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.
To maximize the utility of space under a deck, it’s important to keep this area dry and clean. One way to prevent the area from becoming too wet is to install an under-deck draining system. This affordable home upgrade channels water away from the deck and provides usable space for storage or a functional area below a second-story deck. Not only will this be a useful maintenance upgrade, it can boost your home’s property value.
Building a deck is often worth the investment, not only because it provides more utility to your yard and gives you more space to entertain but also because decks tend to add value to your home. Keep in mind that second-story decks often require concrete footings, which means they will bump up your property taxes, while decks built on the first story generally don’t require a permanent foundation and won’t affect your taxes. Even with the tax increase, decks are usually a good investment in the long run.
The problems with composite decking include a high rate of expansion and contraction from temperature swings. This characteristic can cause boards to split, delaminate, or peel. In addition, significant movement can cause shrinking, warping, twisting, and bending. For this reason, you should minimize moisture and ensure proper airflow below your deck.
The Agency, MO homeowners’ guide to deck repair services
From average costs to expert advice, get all the answers you need to get your job done.
Thinking about adding a deck to your home? Explore this guide to learn about the average cost to build a deck in Kansas City, MO based on factors like size, material, and labor.
Deck replacement costs depend on materials, any structural damage you need to fix, and more. This guide explores how much it costs to replace or repair a deck.
If your deck is in bad shape, this deck repair checklist will help you inspect, clean, maintain, and repair it without missing any vital steps in the process.