Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Scanlon, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Scanlon, MN?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Scanlon

Frank Haydon
2.8(
5
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Scanlon, MN and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Frank was very knowledgeable. He did an excellent job with the pool, pricing was more than fair and he was always making sure I was happy with the way things were going throughout the entire process. I would recommend him again any day and I will be brining him back again when I add more upgrades to the pool room."
Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Yes, many brands make models similar to endless pools with a range of features. Some companies feature temporary aboveground pools that imitate the effect of permanent installations. Small home pool spas—or spools—as well as lap pools and pools without propulsion designs for water aerobics are also available.

You do not need to excavate or lay a foundation for a stock tank pool. You should, however, level the area where you plan to put the stock tank. Also, stock tanks full of water and people can get heavy, so do not place them on a deck or other raised structure that could collapse from the weight.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

In-ground pools lose water naturally due to wind, heat, and humidity. They also lose water from the kiddos' cannonball competitions. But be mindful of the water level. If it drops too low and the pump draws in air instead of water, it will likely be damaged and require repair or replacement.

No, stock tank pools do not get too hot, even when they are set up in a sunny location. Many stock pools are made with galvanized steel and are designed not to get too hot to touch. When your pool is full of water, it is less likely to get hot. The water might be warmer than it would be in an above-ground pool, but it will not be uncomfortable.

If you have kids and want to be extra cautious about the temperature of the stock tank, you may want to set up an umbrella for shade over the pool area.

The Scanlon, MN homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.