Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Scanlon, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Scanlon, MN?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Scanlon

Avatar for DBS Residential Solutions, Inc.
DBS Residential Solutions, Inc.
2.6(
18
)

Serving Scanlon, MN and surrounding areas

Approved

In business since 2012

Free estimates

Emergency services offered

"The job needs to be fixed already it wasnâ t done to completion on day one. I needed the concrete patio to shed water away from the house. It currently is shedding water towards the house. Why I hired them is to correct that problem. My hope is this small issue will be able to be resolved today."
Concrete Repair After
Concrete Repair Before
Cabin Stabilization Before
Cabin Stabilization After
Basement Waterproofing After

+8

Response time1 day
Response rate92%
158 neighbors recently requested a quote
Avatar for Riteway Concrete, Inc.
Riteway Concrete, Inc.
4.1(
151
)

Serving Scanlon, MN and surrounding areas

In business since 2014

Free estimates

Warranties offered

"Very pleased with Riteway, Mike is great to work with and answered all my questions with patience. This was a pole barn floor and 2 aprons. Looks great and even did apron a little longer to have a better slope."
Apron complete
Parking pad
Patio with boarder
Driveway with sideparking
Driveway half done

+167

Response time1 day
Response rate86%
Recommended by89%of homeowners
Avatar for Brother's Construction LLC
Brother's Construction LLC
4.4(
7
)

Serving Scanlon, MN and surrounding areas

In business since 2016

Free estimates

Emergency services offered

"They got the job done promptly & efficiently. Very courteous & kept us informed of any concerns regarding the job. I would definitely contact them in the future if needed & recommend them to friends & family."
Remodeling - General Project
Roofing Project
Recommended by85%of homeowners
Avatar for Mark Betker Construction, LLC -
Mark Betker Construction, LLC -
0.0(
1
)

Serving Scanlon, MN and surrounding areas

In business since 2004

Free estimates

Warranties offered

Concrete Coating Solutions specializes in both residential and commercial epoxy flooring, polyurea (polyasparatic), polished concrete, and commercial shop floors including cove, with a proud portfolio of over a decade. We offer the highest quality professionally installed epoxy flooring in the industry today. So, whether you are looking for protective, durable, seamless, stylish, chemical resistant,high MVE resistance, elegant or tough flooring Concrete Coating Solutions is the company to rely on. \nEpoxy Flooring at it��s Finest\n Concrete Coating Solutions, LLC takes pride in using an application of coatings that will not contaminate order-sensitive products. Our products comply with VOC regulations, LA rule 66 and meet USDA approved guidelines.\n

Before
After
Before
After
After

+24

Recommended by100%of homeowners
Showing 1-10 of 13
Epoxy Flooring questions, answered by experts

It typically takes 1-2 days to coat a concrete floor, including preparation and curing time.

You can paint concrete with paint rollers. In fact, using paint rollers is considered one of the easiest ways to evenly apply paint on concrete. A paint roller with a 1/2- to 3/4-inch-thick nap—which is basically a fabric paint roller cover—is best for painting concrete. The thicker the nap, the more paint it can hold to fill those pesky concrete cracks and crevices.

Installation typically takes 2-5 days, including preparation, pouring, and curing time.

New flooring costs quite a bit, so longevity is important to think about. Concrete generally has the longest life span, but it’s not always a good solution for homes with wooden subfloors. That said, hardwood floors and stone floors can last up to 100 years, and you can refinish or restore them to remove imperfections from daily wear.

Apply two coats of paint to a garage floor after priming for optimal results. The first coat serves as a base layer, providing adhesion and coverage. Allow the first coat to dry thoroughly before applying the second coat, typically after 12 to 24 hours. The second coat ensures even coverage and durability and enhances the floor's appearance. Additionally, applying two coats helps to create a more substantial barrier against stains, chemicals, and wear and tear, resulting in a longer-lasting finish. 

The Scanlon, MN homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.