Top-rated rototilling pros.

Get matched with top rototilling pros in Aitkin, MN

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Aitkin, MN?

Select your specific project to find the pro for you.

Find Rototilling pros in Aitkin

Richards Forestry

No reviews yet

Richards Forestry

No reviews yet
18 years of experience

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING


Rototilling questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Environmental considerations include native plant selection, wildlife habitation, erosion prevention measures, and managing water runoff patterns to protect the lakefront ecosystem.

Fixing a depression in your lawn is a DIY for small dips, divots, or slight slopes. You can either remove sod and earth to lower the uneven ground or add premixed topsoil and reseed the lawn to raise it. You can also hire a yard grading company near you for professional help.

Typically 1-3 days, depending on property size and terrain condition.

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.