Top-rated subcontractors.

Get matched with top subcontractors in Wolverine, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Wolverine, MI?

Select your specific project to find the pro for you.

TRUSTED BY WOLVERINE, MI HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon70
    Verified subcontracting services reviews

Find Subcontractors in Wolverine

Avatar for North West Home Solutions LLC
North West Home Solutions LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Wolverine, MI and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"North West Home Solutions did Excellent Work on our home!! I am Very Pleased with their recent work on our roof! They did exactly what was needed. Our roof and chimney has been sealed off to stop the water damage and they have completely fixed our interior ceilings from the damage caused. I would Highly recommend them."
Remodeling - General Project
Additional Photos
Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Wolverine, MI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Wolverine, MI and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Destination Home Builders
Destination Home Builders
3.7(
3
)
Major Home Repairs (General Contractor)

Serving Wolverine, MI and surrounding areas

In business since 2021

Emergency services offered

Credit card accepted

"Joel and his team did a great job. Arrived on time, were diligent in their work and paid attention to the details. They stuck right with the project until completion. At the end Joel took the time to review everything to make sure it finished as expected. Well done. And I already have more work lined up for Joel and his team."
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office

+17

Response time4 days
Response rate100%
Recommended by33%of homeowners
Showing 1-10 of 19
Subcontractors questions, answered by experts

Mid-century modern architecture was a popular home style throughout the U.S. from the 1950s to 1970s. Most homes feature a wide and symmetrical floor plan with low-sloped roofs and floor-to-ceiling windows. Its minimalism and balanced appearance are back on the home style scene, particularly when maximizing sunlight, airflow, and a blend with the home's natural surroundings.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Costs depend on material, size, design complexity, and additional features like lighting or seating.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Wolverine, MI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.