Top-rated subcontractors.

Get matched with top subcontractors in Onaway, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Onaway, MI?

Select your specific project to find the pro for you.

TRUSTED BY ONAWAY, MI HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon23
    Verified subcontracting services reviews

Find Subcontractors in Onaway

Avatar for North West Home Solutions LLC
North West Home Solutions LLC
5.0(
8
)
Major Home Repairs (General Contractor)

Serving Onaway, MI and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"North West Home Solutions did Excellent Work on our home!! I am Very Pleased with their recent work on our roof! They did exactly what was needed. Our roof and chimney has been sealed off to stop the water damage and they have completely fixed our interior ceilings from the damage caused. I would Highly recommend them."
Remodeling - General Project
Additional Photos
Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Onaway, MI and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Onaway, MI and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Destination Home Builders
Destination Home Builders
3.7(
3
)
Major Home Repairs (General Contractor)

Serving Onaway, MI and surrounding areas

In business since 2021

Emergency services offered

Credit card accepted

"Joel and his team did a great job. Arrived on time, were diligent in their work and paid attention to the details. They stuck right with the project until completion. At the end Joel took the time to review everything to make sure it finished as expected. Well done. And I already have more work lined up for Joel and his team."
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office

+17

Response time4 days
Response rate100%
Recommended by33%of homeowners
Showing 1-10 of 17
Subcontractors questions, answered by experts

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

While you will always work with a team of professionals at some point during your home build, homeowners with experience can take on some part of the process. Manage the initial brainstorm, brief writeup, and floor layout phase with minimal assistance before contacting a general contractor. And while you can purchase stock blueprints for some home designs, it's always best to speak with professionals when choosing one ideal for your property.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Onaway, MI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.