Top-rated excavation pros.

Get matched with top excavation pros in Plainfield Township, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Plainfield Township, MI?

Select your specific project to find the pro for you.

Find Excavation pros in Plainfield Township

Avatar for Diggity Dirt
Diggity Dirt
5.0(
12
)
Landscape - Minor Grading or Resloping

Serving Plainfield Township, MI and surrounding areas

Approved

In business since 2019

Free estimates

Emergency services offered

"Would not hire anyone else. Diggity Dirt is top notch. You will not be disappointed they will go out of their way to deliver you the product you want and when you need it."
Response time12 hrs
Response rate89%
3 neighbors recently requested a quote
Avatar for Parkers Asphalt and Sealcoating LLC
Parkers Asphalt and Sealcoating LLC
5.0(
6
)
Landscape - Minor Grading or Resloping

Serving Plainfield Township, MI and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"We had the cracks refilled and driveway seal coated. It looks amazing. 5 stars for Parkers! Great customer service, before, during and after the job was done. My mother said "They worked really hard. They couldn't have done a better job. " Great work guys!"
Response time2 days
Response rate90%
4 neighbors recently requested a quote
...
Showing 1-10 of 138
Excavating questions, answered by experts

The best type of soil to build on is a mixture of sand and clay, known as loam soil. Loam soil has the best combination of these soil types to build a foundation on. The clay particles help with water retention, so it won’t erode like sandy soil might, and the sandy particles help with drainage, so you won’t see unsafe soil expansion or have an increased risk of leaks from water sitting against your foundation.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

While general contractors sometimes handle demolition, you can also look specifically for local demolition contractors. Demolition experts need to understand structural integrity, the equipment needed for safe demolition, and the permits required for demolition.

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

The Plainfield Township, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.