Top-rated basement remodelers.

Get matched with top basement remodelers in Holton, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Holton, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Holton

Avatar for H & B CONSTRUCTION, LLC
H & B CONSTRUCTION, LLC
4.9(
17
)

Serving Holton, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Small jobs welcome

"I wanted a screen porch added to the back of my house, and they did a really lovely job. I wanted something quite simple, and they didn't at any point pressure me to make it more elaborate or more expensive. The final result is just what I wanted - simple, really well constructed, and beautiful. They're very easy to work with. Highly recommend."
Response time11 hrs
4 neighbors recently requested a quote
Recommended by81%of homeowners
Avatar for Bob's Complete Construction, Inc
Bob's Complete Construction, Inc
3.7(
155
)

Serving Holton, MI and surrounding areas

In business since 1988

Emergency services offered

Credit card accepted

"Bob returned my call on Thursday, 6/19/14 at 1p. It sounded to me like he was coming right over to inspect the hole. I waited 7 hours; then finally called him to say it was after 8p and I wanted to eat dinner, etc. The TV was playing in the background. He'd forgotten. He apologized and said he'd come by at 9a the next morning (Friday, 6/20/14). And he did.
In the meantime, I went to my shed an got my dog's wading pool, hauled it to the attic, and placed it under the hole in the roof.
After Bob inspected the hole from inside the attic, he gave me an verbal estimate of $125 and said he'd fit me in some time the following week. By Friday of the next week (6-27-14), I called Bob. He said he'd fix my roof early next week.
On Monday, 6/30/14, Bob rings the doorbell at 5p. He didn't call ahead of time, because he hadn't written down my phone number.
The job took an hour. He used my ladder, broom, scrap wood board, and shingles.
He had quoted $125. He asked for $150.
I paid the $150 and did not use the Angie's List coupon (I had forgotten to mention that I had printed one off on the day he made his quote so it was invalid).
June had been a really hot, sticky month. Bob had mentioned that he was really, really busy. He was always up-beat. I understood the delays but wished he had remembered my name and number instead of me having to call him back. He was the only person who was even interested in fixing my roof. The original roofing firm would not return my calls. (Too small of a job?)
Bob's assistant went above and beyond. While he was waiting for Bob to inspect the hole from on top of the roof, he brushed small branches, etc. from off the roof and then swept the debris from the gutters. <AWESOME!> (The neighbor's big oak trees drop a lot of branches, leaves, limbs on my roof. Thus, the hole in the roof.)
I'm glad the hole is fixed and would use Bob again (even with his quirks).
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by69%of homeowners
Avatar for Vander Hyde
Vander Hyde
4.3(
363
)

Serving Holton, MI and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"Michael and his colleague were professional, knowledgable and courteous.  Their ballpark estimate was fair for the amount of work required.  However, the project required more than the potential value of the home would support and we decided not to purchase the home and move forward with the remodel.  I would call on them again for any future projects.  
"
Recommended by81%of homeowners
Weatherhead & Sons Inc
3.7(
27
)

Serving Holton, MI and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"The initial work went well but we have had several issues since then and he doesn't follow through or be responsive.  We have had to contact others regarding the repairs/issues that were seemingly the result of the new roof and skylight.  We have asked him to come out three times but he has only shown up once.  We paid the big bucks thinking we would get great service but have been more than disappointed with Weatherhead's accountability.
"
Recommended by73%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Holton, MI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 29
Basement Remodel questions, answered by experts

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

There are several small, inexpensive upgrades you can make to upgrade your basement. Although you still need to adhere to building codes and obtain permits when necessary, you can complete small but mighty tasks like painting the masonry walls and installing entertainment devices to make the space more usable. 

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The Holton, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.