Top-rated basement remodelers.

Get matched with top basement remodelers in Fair Haven, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Fair Haven, MI?

Select your specific project to find the pro for you.

TRUSTED BY FAIR HAVEN, MI HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon37
    Verified basement remodels reviews

Find Basement remodelers in Fair Haven

Avatar for Finished Basements Plus
Finished Basements Plus
4.6(
65
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

Approved

In business since 2003

Free estimates

Warranties offered

"All I needed was half my basement repaired from water damage due to a broken pipe. They would not come out to even quote the job unless they were going to rebuild the entire basement. At least they didn't waste my time."
Ceiling Detail
Open Rail Staircase
Custom Kids Play Space
Main Area
Open Concept Floorplan

+193

Response time12 hrs
Recommended by68%of homeowners
Avatar for XP Construction, LLC
XP Construction, LLC
4.7(
17
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

Approved

In business since 2015

Free estimates

Customers say: Quick response

"I shared my budget and project needs with XP Construction company, and they confirmed they could make it happen within budget. There were no added costs through the process. The XP Construction team was incredible to work with! They were professional, on time every day, and highly skilled. They are the only company I will call for my bathroom and kitchen remodel projects moving forward!"
Kitchen after
After
After
kitchen
bath

+85

Response time20 mins
1 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Artistic Construction and Design, LLC
Artistic Construction and Design, LLC
5.0(
11
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"Craig and his crew are awesome, I’m So glad I picked Artistic Construction and Design !!! I got 3 bids for my basement project, all highly rated on “Angie” and Craig was the lowest ……by over $20,000 !!! The best part is that Craig designed everything and gave us a blueprint. His finish crew (Chris and Kenny’s ) work was excellent and there crew shows up every day at 7am till finished ……literally found a diamond in the ruff !"
bathroom
view to work out room
main area
back wall
feature wall 1

+9

Response time7 hrs
Response rate91%
5 neighbors recently requested a quote
Avatar for Superior Home Building LLC
Superior Home Building LLC
4.2(
35
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"Jerrod and his team did some updates for us a few years ago so when we decided to do this upgrade, we called him first. His prices were great and he and his team were polite, professional and honest throughout both remodels. We have more projects we want done in the future and plan to call Jerrod for those also."
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator

+31

Response time1 day
Response rate100%
9 neighbors recently requested a quote
Avatar for MaxCraft LLC
MaxCraft LLC
5.0(
7
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

In business since 2021

Credit card accepted

"Wonderful work from a highly motivated professional. Jesse is everything you could want in a builder: Punctual, polite, careful, and neat. His work was perfectly done and I couldn't be happier. I will definitely call him for all my remodeling and building work."
Beautiful Elevated Deck Rebuild
Decks & Porches Project
Decks & Porches Project
Beautiful Lakehouse
Beautiful Elevated Deck Rebuild

+28

Recommended by100%of homeowners
Avatar for Matrix Basement Finishing
Matrix Basement Finishing
4.0(
65
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

In business since 2009

Free estimates

Warranties offered

"When we signed the Matrix contract in June 28,2018 for basement work we were told it would be done the end of October or the first of November 2018. We told them that was good because we go to Arizona the end of December 2018. When we left all that was done was rough: framing, plumbing, electrical and ceiling. In May 2019 Matrix started work again and finally June 17, 2019 the final inspection was done. If Matrix overbooked jobs, Matrix should let the customer the customer know and not leave them hanging. Being overbooked was probably why the drywall job and the soffit run to cover the ceiling beam was less than professional. We give the following grades: grade A to the project manager, the other work teams. grade C to Matrix as a company. Thank you, Jack and Bonnie Childs"
Happy Bathroom Customers
Happy Bathroom Customers
Happy Bathroom Customers
Basement 1
Basement 1

+54

Response time2 days
Response rate100%
Recommended by92%of homeowners
Avatar for 4 Ever Water Tite
4 Ever Water Tite
4.7(
116
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"The guys from 4-Ever Water-Tite were great! Prior to contracting 4-Ever Water-Tite, I had problems with water and excess moisture in my basement. My basement walls were also pushing in laterally. They put in a perimeter drain system and a new sump pump. They also installed steel support beams to support the walls. I am happy to report that it has now been a full year since 4-Ever Water-Tite worked on waterproofing my basement and it has remained dry. I highly recommend this company."
Recommended by97%of homeowners
Avatar for Handyman Construction Service Inc
Handyman Construction Service Inc
4.3(
109
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"Services and work were delivered timely and were well done. Al made sure to ask about anything he was unsure of (where we wanted lights exactly, etc.). Al was extremely professional and great to work with, would highly recommend to anyone."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+20

Recommended by87%of homeowners
Avatar for Brand New Construction LLC
Brand New Construction LLC
4.5(
288
)
Basement - Remodel

Serving Fair Haven, MI and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"Barely ten minutes in, I was told that they could NOT do their main test, because I had asbestos tiling in the basement. It would have been nice had they mentioned this when I made the appointment - I could have told them then and saved myself a LOT of money."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by87%of homeowners
Showing 1-10 of 45
Basement Remodel questions, answered by experts

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

The Fair Haven, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.