Install Above Ground Pools questions, answered by experts

The amount of time your fiberglass pool project will take depends on the size of the pool and whether you are installing add-ons like decking and landscaping. Overall, you should expect it to take four to six weeks to install. If you are dreaming of summer pool parties, make sure to budget enough time into the installation schedule to have your pool up and running in time for the swimming season.

DIY is possible for minor repairs like patching liners. Professional services handle structural and mechanical issues.

The cost to maintain a pool depends on its size and condition. A one-time pool cleaning session costs around $250, and regular weekly maintenance costs $25 to $40 per week. You can get a discount if you buy services in bulk. Regular pool maintenance helps limit the number of repairs and identify signs of trouble.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

It takes more electricity to run one, so it’s not necessarily cheaper to run a salt water pool. However, the cost difference is relatively minor; it may cost an extra $50 over the course of a year. However, salt costs a lot less than chlorine sanitizers. This lowers the overall maintenance costs for a salt water pool compared to chlorine pools.