Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Gardiner, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Gardiner, ME?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Gardiner

Avatar for Concrete Xtreme
Concrete Xtreme
4.5(
20
)
Concrete Driveways - Install

Serving Gardiner, ME and surrounding areas

Approved

In business since 2019

Free estimates

Emergency services offered

"Mr. Bowser was prompt, hard-working and just a positive person to have doing work for me. I was impressed with his work ethic and the work he completed. I won't know how well it worked until the next heavy rainstorm, but I have faith in the job he did."
Response time1 day
Recommended by100%of homeowners
Avatar for Purgo Works
Purgo Works
5.0(
11
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Gardiner, ME and surrounding areas

Approved

In business since 2020

Free estimates

Warranties offered

"I needed someone to help with a garage clean out. Everything in there was ready to go. Purgo Works immediately responded to my request. They were very professional and took everything that I needed them to take. It was such a relief to be able to use my garage again."
Response time7 hrs
Response rate100%
4 neighbors recently requested a quote
...
Showing 1-10 of 117
Asphalt Driveways questions, answered by experts

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

The Gardiner, ME homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.