Top-rated subcontractors.

Get matched with top subcontractors in Ferndale, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Ferndale, MD?

Select your specific project to find the pro for you.

TRUSTED BY FERNDALE, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon4.1k+
    Verified subcontracting services reviews

Find Subcontractors in Ferndale

Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The master bathroom renovation process we experienced was frustrating and plagued with many unnecessary delays and quality control breakdowns. Having gone through numerous home improvement projects, we carefully researched companies and selected VKB Kitchen and Bath in large part because of the overwhelmingly positive reviews we read on numerous websites, including Angie’s List. Unfortunately, the company we worked with bore little resemblance to the glowing reviews we read. While we are ultimately happy with the finished product, we do not feel anyone should experience the frustrating ordeal we went through to have a bathroom renovated. Consequently, we cannot recommend VKB Kitchen and Bath. We signed a contract with VKB on March 17, 2016, to perform a complete renovation of our master bath. The project was to follow the VKB designer’s specifications, and was to be substantially completed in 2 weeks—their estimate, not ours—with minor items to be addressed in a final third week. The actual renovation began on April 19th, a week later than originally planned. From the beginning, we experienced problems. VKB gave us access to an automated project management tool to check on the job’s status, see what work was scheduled each day, see any change orders for modifications made during the renovation, and communicate any questions or concerns through its message board. VKB was to use the tool to communicate progress, work schedules, and responses to our questions. If actually used and kept current, it would have been a helpful resource to monitor the job’s status and any slippages. However, VKB rarely used it, and when it was used, it presented grossly inaccurate information (ex., noting tasks as “completed” when they had not been started or were well behind). Toward the end of the job, after numerous delays and a turnover in the subcontractor VKB hired to perform the work and the reassignment of the project manager, the lead designer—Joe—used the messaging feature more frequently to timely respond to our questions or concerns and to better inform us as to the new sub-contractor’s work schedule. Demolition of the old master bathroom took several days, primarily because most of the work was done by one worker. This pattern continued during construction of the new bathroom. Each day, several workers would show up to unload equipment, but then typically most would go to another job site, leaving just one person to handle much of the work. We were told that the crew would begin work between 8 a.m. and 9 a.m. and would work full days as long as there was work to be done, yet for the vast majority of the time the initial subcontractor was involved, the crew would not show up until 10 a.m. or later, and would usually leave between 3 and 4 p.m. There were days when no one showed up and we were not notified that no one would be coming that day, despite there being ample work. The lack of sufficient workers and erratic work hours were major factors in the job quickly falling behind schedule. When we raised concerns about job slippages to VKB’s project manager, he dismissed our concerns. Serious communication issues existed between the subcontractor and VKB’s project manager which led to mistakes and delays. For example, one key design decision prior to commencement of the renovation was the removal of a ceiling and wall bulkhead to allow for more open space. The bulkhead wall contained a ventilation register which had to be removed and rerouted through a toe-kick in one of the new vanities. Due to miscommunications, the subcontractor tiled over the ventilation opening on the floor. The crew had to subsequently pull up newly-installed tile to create a ventilation path and install a new vent. However, because of the manner in which this ventilation path was constructed, the floor register did not fit properly flush with the tile floor. It still does not fit properly to this day. To be fair, issues arose which contributed to delays in the job that were not originally anticipated. For example, when the subcontractor finished the demolition, he noted that the floor was not completely level. To his credit, he took steps to fully level the floor, which took a day to complete. Additionally, in designing the new bathroom, the designer envisioned shifting the position of the toilet. As the job progressed, the subcontractor and project manager realized this would not work without extending a wall. We agreed with this change, which added another day to the project. Finally, we were scheduled to be out of town beginning in mid-May, which resulted in the crew not being able to work on the job for 10 days. Yet, had the job met the original contracted timeframes, it should have been completed nearly 2 weeks prior to our trip. When little additional progress had been made 2 weeks after our return, VKB reassigned the project manager and Joe, our lead designer, fired the subcontractor and brought in a new subcontractor to complete the bathroom renovation. However, this subcontractor had to work us into his existing jobs, putting a strain on his crew. To further complicate the new subcontractor’s job, there were numerous instances in which materials delivered were either defective or incomplete. For example, a large wood linen cabinet was unfinished on one side, resulting in VKB having to order a piece to finish the side. Additionally, the cabinet, and two vanities that were to be installed were supposed to have two side-by-side doors. When we inspected the delivered cabinet and vanities, we found that they had single doors. After noting this to VKB, we were told that the manufacturer did not make vanities that had two side-by-side doors, though they were in VKB’s design and the contract specified them. When we noted this would be problematic with respect to the linen cabinet given its placement in the bathroom, VKB said the cabinet could have side-by-side doors but it would require re-ordering them. We later found out that any re-ordering of items would require 2-to-3 weeks from the time of ordering until the items would arrive. While a 2-to-3 week delay was bad enough given the significant slippages already incurred, it turned out that VKB also misjudged other wood materials needed from this same manufacturer to complete the cabinet and vanity installation–such as trim and crown molding we had requested prior to commencement of the renovation–which resulted in another several weeks of delays. The end result of these missteps was that the new subcontractor had to pull out on two occasions for a period of 2 weeks each to allow time for new and/or replacement parts to arrive. Additionally, VKB twice sent out a separate crew to install the shower door and glass, and each time, the crew had to leave without performing the installation because work on the shower was not sufficiently complete for them to install the glass. When they were finally able to attempt the installation, they discovered an error in the manufacturing of one side of the glass. They had to reorder the side, resulting in yet another delay. Perhaps most disturbing is that the door and glass had been ready for weeks, yet no one checked them to ensure the manufacturer had completed them to specification. Other examples of this abound, including delivery of bathroom sinks and countertops which were not properly made and hardware for the cabinet and vanities, which were missing handles. Many of these problems could have been prevented or at least detected and addressed earlier had VKB had an effective process in place to ensure all materials ordered from vendors were inspected for both quantity and quality as soon as they were received. As a result of these problems, our master bathroom renovation—which was to have taken at most 3 weeks—took nearly 4 months to complete. Final work was completed on August 8th. Even at that, we ultimately settled for certain things simply to end the ordeal and move on. For example, the floor register that had been improperly installed by the initial subcontractor was never properly resolved by VKB—its solution was to cut the register bottom"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
4 neighbors recently requested a quote
Recommended by91%of homeowners
Avatar for FAMB Construction, LLC
FAMB Construction, LLC
5.0(
22
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 2019

Free estimates

Customers say: True professional

We at FAMB Constuction LLC, we focus on quality services over quantity. We use our years of experience and expertise to complete your project with perfection. Customer service and honesty are the most important aspects of our business and your satisfaction is guaranteed. Please call us today for an estimate.

Regular Wood Deck
Deck
Deck
Frame Moulding
Deck

+37

Response time1 day
Recommended by95%of homeowners
Avatar for Misha's Home Improvement Inc
Misha's Home Improvement Inc
4.6(
42
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 1993

Warranties offered

Customers say: Super punctual

"We purchased a home as is which required a fair amount of work, most of which we could only account for after the purchase. The contractor showed up before and after purchase to do a full review of inspection and structural engineer recomendations and walked us through our options. We walked through the initial estimate, but the contractor also showed us areas where we could potentially save/or expend more money. This was a 2 story house built in 1936 with a small basement with crawlspace.
The contractor showed up at our location daily (including weekends) for 1.5 months with 2-6 employees (not subcontractors or off-the-street laborers). Whenever anything came up the contractor would call me and walk me through my options. The process was extremely helpful, because we were able to see where our initial plans required a litte adjusting to accomodate for structural limitations. Misha was very frank and honest and was very helpful throughout.
At the end, we ended up more than doubling our initial scope of work (decision made by us, not the contractor), but the cost stayed pretty much the same because Misha showed us areas where we could save.
I would highly recommend Misha's Home Improvement to anyone looking for a contractor."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Response time2 days
3 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for E&V remodeling innovation
E&V remodeling innovation
5.0(
16
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Emergency services offered

Our mission is to be a provider that brings back the personal touch with our customers. We will build a relationship that will last a lifetime after you see our quality work. As a locally owned and operated business, we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Framing Project
✨
Framing Project
Deck
Deck

+3

Response time2 days
Response rate86%
Recommended by31%of homeowners
Avatar for JEB Services
JEB Services
4.8(
69
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

JEB Services is a family own business since 2006 with more then 20 years experience servicing the area of MD. Here at JEB Services we offer all type of handyman services both residential and commercial. We take pride in what we do and treat all of your needs as if they were our own . Give us a call for a free estimate.

General area
General area
walk in shower
walk in shower
General area

+4

Response time9 hrs
Response rate89%
5 neighbors recently requested a quote
Avatar for 4 Seasons Construction
4 Seasons Construction
5.0(
9
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

Customers say: True professional

"The owner of 4 Seasons Construction (Gus) was extremely talented at his work and effectively communicated with us and the relevant subcontractors. He showed an attention to detail that lead to high quality results and final finishing and he was also very helpful in providing advice on design choices. After the end of the project, he went above and beyond to correct my mistake in the closet design we gave him. He is someone we highly recommend to others and someone we plan to use again in the future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+96

4 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for New Line Remodeling LLC
New Line Remodeling LLC
5.0(
12
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 2000

Free estimates

Emergency services offered

Your home deserves the care of a team that treats every project like it is their own.\nTransforming homes across Maryland, From Kitchen remodels and bathroom renovation to full Basement finished\n. Licensed, Insured and Trusted in Maryland \n.Quality Craftsmanship , Honest communication\n. Free Consultation & Detailed Estimates\n

Bathroom Remodeling
Kitchen
Additional Photos
Additional Photos
Additional Photos

+103

Response time1 day
3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for John Krause Construction
John Krause Construction
4.4(
168
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"The job went well. Even small problems were handled. The contractor did need to oversee subcontractor for roof better. They agree. They kept me in the loop well most of the time and had numerous suggestions that were helpful. Big quality was top rate because the people doing the work where that type of crew. That makes all the difference for any job."
Pool House Exterior with Floor-to-Ceiling Windows & Doors, Two Pergolas, & Cupola with Windows
Modern Farmhouse Kitchen
Luxury Bathroom Renovation with Free-Standing Clawfoot Tub & Chandelier
Pool House - Side Entrance
Modern Farmhouse Kitchen with Farmhouse Sink, Pull-Down Faucet, Stainless Steel Range, Range Hood, Double Wall Oven, and Dishwasher

+113

Response time2 days
14 neighbors recently requested a quote
Recommended by88%of homeowners
Dimitri's Home Improvement
4.8(
36
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 1972

Free estimates

Emergency services offered

"Although it took longer than anticipated by everyone, I deeply appreciate the methodical way Dimitri and his team took every single measure necessary to ensure that my home was structurally safe and sound for me and my family. Every team member and every subcontractor in his employ was kind, polite, and thorough in their jobs. I really cannot imagine what situation I would be in without Dimitri and his team. Every step of the way, they kept me informed and helped me problem solve issue after issue. They were angels on earth."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Response time7 hrs
6 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for D & H Demolition, LLC
D & H Demolition, LLC
5.0(
11
)
Major Home Repairs (General Contractor)

Serving Ferndale, MD and surrounding areas

Approved

In business since 2013

Free estimates

Emergency services offered

Leading the industry by providing a comprehensive service to residential & commercial clients in need of selective & structural demolition , hazardous material abatement and disposal , as well as mold remediation services. Call or click for your FREE estimate today!\n

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Response time8 hrs
6 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 478
Subcontractors questions, answered by experts

Dark academia is more of an interior decorating style than it is a type of architecture, but it calls on themes prevalent in gothic architecture. Part of the appeal of dark academia is that you can achieve the look and feel without renovating or remodeling your home. Instead, you can switch to a dark color palette and introduce metal, natural wood furniture, plaid decor, old books, and gothic decor to get the look and feel just right.

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Expect excavation below grade, creating a well for access, weatherproofing, and thorough inspections during setup.

Building designers charge between $2,000 and $50,000, depending on project scope, complexity, and customization.

The Ferndale, MD homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.