Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Saint Rose, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Saint Rose, LA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Saint Rose

Avatar for JAMF Fencing and More
JAMF Fencing and More
5.0(
2
)
Gate for Driveway or Security - Install or Replace

Serving Saint Rose, LA and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

"They worked very fast, was able to schedule my project in a timely manner. Jose used quality materials, clean and very professional . Provided service with a smile. I would highly recommend this company."
Response time2 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 234
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Common alternatives to a gravel driveway include concrete, asphalt, brick, stone pavers, and permeable pavers. Concrete and asphalt are generally the most affordable options. However, concrete can be prone to cracking in cold climates, while asphalt may soften in areas with high heat and direct sun exposure. For enhanced curb appeal, brick, stone, and permeable pavers are popular choices, though their installation can be more expensive due to intricate designs. Stone pavers offer a natural look and are sometimes installed with gravel around them. Both permeable pavers and brick driveways provide excellent drainage, which helps prevent flooding and reduce water runoff.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Saint Rose, LA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.