Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Martin, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Martin, KY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Martin

Helton Grading, Inc.
New to Angi
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Martin, KY and surrounding areas

Approved

In business since 1981

Free estimates

Credit card accepted

HELTON GRADING INC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.

Avatar for CAS CONSTRUCTION LLC
CAS CONSTRUCTION LLC
5.0(
6
)
Concrete Driveways - Install

Serving Martin, KY and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"CAS CONSTRUCTION did a wonderful job at my office. I would recommend them to any business or residence. Their customer service was top tier and communications were seamless. Thank you CAS CONSTRUCTION for a great experience."
Back Deck
Building deck
completion
Before and after projects
Before and after projects

+7

Response time3 days
Avatar for Henson CCB
Henson CCB
4.0(
1
)
Concrete Driveways - Install

Serving Martin, KY and surrounding areas

In business since 2004

Free estimates

We're dedicated to providing our clients with the very best in concrete installation and repair for driveways, sidewalks, patios, steps, and a variety of other projects. With over 17 years of industry experience, we take an enormous amount of pride in the attention to detail put into each of the projects we're involved with. We're known for our quality work and the integrity of our business. We look forward to building long-term relationships with our clients, and guarantee your satisfaction.

Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 47
Asphalt Driveways questions, answered by experts

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Martin, KY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.