Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Harold, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Harold, KY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Harold

Morris Homes
New to Angi

Serving Harold, KY and surrounding areas

In business since 1990

JL Morris Homes is a locally owned, full-service contractor that serves the Southeastern, Central and Eastern Kentucky area. We offer expert installation, maintenance and repair services for your Home Building and Remodeling needs. Offering over 12 years experience in the construction business.\n\nWhether you need new construction, remodeling or maintenance, you can count on JL Morris Homes for all your building needs.\n

Asphalt Driveways questions, answered by experts

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

Regular sealing, crack filling, and professional inspections help extend pavement lifespan and prevent costly repairs.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

The Harold, KY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"