"Greg and his crew were very experienced and did a very nice job. From demo of the existing old deck to the construction of our new composite deck we were pleased with their work. I would highly recommend them."
"Once I sent her all the measurements, it took her a little while to get the options back to me. Overall, they're good designs. However, they're very simplistic and give general ideas for space planning. I was hoping to have a better idea for sizes of furniture for the space and some variations on staging. Jill was very responsive when I did have a question. I'm not sure how helpful it is to have a virtual design done. If we lived in similar cities, I'd probably use her again for help with additional designs. "
"For the second time we are so pleased with our recent contract with Potter House Group. Our first experience with Potter House Group was a new build construction project. They found us a lot and built us a custom home about 9 years ago. Since then we relocated into a 115 year old home and we hired them for our kitchen remodel. First we did our research, and we sought bids from several contractors. Potter House Group once again had a competitive quote, that we felt had all the "bases" and potential "surprises" covered. We also felt that the allowances that were allotted in our estimate allowed us to select quality selections for the fixtures, granite, cabinetry & flooring. What impressed us the most is that once again we worked directly with the owner, Lee, for the duration of the project. From the very beginning, Lee was professional, honest, and extremely efficient with our time. Our kitchen was completely gutted down to the bare studs, removing of walls, flooring, electric, and a back staircase. When you are without the hub of your home-the kitchen-meeting timelines is very important. They met all timelines and brought in the necessary resources and tradesmen to perform various scopes of work. All the inspections that were needed went well too. Lee addressed any questions or concerns we had during the process responsively. Without a doubt, Potter House Group will be the contactor we use for the next job. We are already dreaming of our next project, a master bath addition. Can?t wait! Potter House Group is highly recommended!!! Thank you Lee for a beautiful kitchen!"
"I never contacted the provider or used this service in anyway. I have to write this review so that the request to write this review stops popping up. The rating is bogus as it is required to be able to submit. "
"I had roof repair at my home and gutter and siding replacement on my rental. Both went well, I had a problem with the siding and they came out and fixed it. "
"It wasn’t the right time for my mom to get the job done, but De Arias was quick to respond to my initial questions and was always quick to follow up! I will certainly contact them when my mom is ready have her deck stained."
"The guys were on the job very quickly. They did a good job, and were very easy to work with. Price was very fair, also. I would recommend them anytime."
The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.
While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.
A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.
Yes, custom designs match existing structural and aesthetic themes.
The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.
The Gamaliel, KY homeowners’ guide to subcontracting services
From average costs to expert advice, get all the answers you need to get your job done.
There are several steps you should take before hiring one or several subcontractors. This guide leads you through the necessary research and questions you should ask before hiring a subcontractor for your next home project.
Learning how to hire subcontractors can help your home renovation run smoothly, whether you’re a general contractor or a homeowner handling things directly.
A general contractor is an essential but costly part of a construction project. Learn how to be your own general contractor for your next home improvement project.