Top-rated subcontractors.

Get matched with top subcontractors in Riley, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Riley, KS?

Select your specific project to find the pro for you.

TRUSTED BY RILEY, KS HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon309
    Verified subcontracting services reviews

Find Subcontractors in Riley

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Riley, KS and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Riley, KS and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Weisbender Homes, LLC
Weisbender Homes, LLC
3.6(
4
)

Serving Riley, KS and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"Weisbender homes did a great job fixing my ceiling. I called and he came out right away to get me an estimate. The work was professionally done with attention to detail. It was completed in a timely manner and at a resonable cost. I am very happy with my new ceiling."
3617 Eastridge
3617 Eastridge
3617 Eastridge
3617 Eastridge
3617 Eastridge

+428

Response time2 days
Recommended by100%of homeowners
Avatar for Dunn’s painting & remodeling llc
Dunn’s painting & remodeling llc
5.0(
1
)

Serving Riley, KS and surrounding areas

In business since 1990

Free estimates

"Everything went well. Mr. Dunn and his team were very quick and very professional He gave me a free estimate to start and we were very pleased when the Jon was completed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+13

Recommended by100%of homeowners
Showing 1-10 of 15
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

By providing precise guidelines that reduce errors and facilitate smooth execution.

Dark academia is more of an interior decorating style than it is a type of architecture, but it calls on themes prevalent in gothic architecture. Part of the appeal of dark academia is that you can achieve the look and feel without renovating or remodeling your home. Instead, you can switch to a dark color palette and introduce metal, natural wood furniture, plaid decor, old books, and gothic decor to get the look and feel just right.

While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.

The Riley, KS homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.