Top-rated subcontractors.

Get matched with top subcontractors in Junction City, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Junction City, KS?

Select your specific project to find the pro for you.

TRUSTED BY JUNCTION CITY, KS HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon511
    Verified subcontracting services reviews

Find Subcontractors in Junction City

Avatar for Deluxe Development
Deluxe Development
New to Angi
Major Home Repairs (General Contractor)

Serving Junction City, KS and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

We are a veteran-owned residential remodeling company committed to delivering high-quality craftsmanship with integrity, precision, and reliability. Built on the core values of discipline, accountability, and attention to detail, we take pride in transforming homes into functional, beautiful spaces that stand the test of time.\nOur services range from full-scale renovations to custom decks, structural improvements, and detailed finish work. We approach every project with a hands-on mindset, clear communication, and a dedication to doing the job right the first time—no shortcuts, no compromises.\nAs a veteran-owned business, we understand the importance of trust, follow-through, and earning our reputation with every project we complete. Our mission is simple: provide homeowners with a seamless remodeling experience and results they can be proud of.

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Junction City, KS and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Junction City, KS and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 22
Subcontractors questions, answered by experts

The country's most famous Neoclassical architecture appears in major government buildings and college campuses. The White House is unmistakably the most famous example, though the Capitol Building and Thomas Jefferson's Monticello are also iconic uses of the design.

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Junction City, KS homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.