Top-rated deck maintenance specialists.

Get matched with top deck maintenance specialists in Windfall, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your deck maintenance project in Windfall, IN?

Select your specific project to find the pro for you.

Find Deck maintenance specialists in Windfall

Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)

Serving Windfall, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I called Maximus Contracting about needing a new roof because of hail/wind damage.  I needed it quickly because we're selling the house soon, and I didn't have a big budget to work with because I received less from my insurance company than I was expecting.  Eric called back quickly and gave me a very reasonable estimate for the work.  The new shingles are of better quality than my original roof, and it looks great.  I finalized my shingle choice with Eric, and the crew completed the work the very next day.  Eric even came out to my office a couple times because my schedule doesn't often allow me to be at home during the day.  All in all, it was a great experience.  I feel confident that I received a great value, and the customer service was exceptional.  I would highly recommend using this company!
"
Recommended by92%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Windfall, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Bautista Landscaping Services
4.5(
11
)

Serving Windfall, IN and surrounding areas

Free estimates

Credit card accepted

"Octavio and crew arrived early and worked hard all day long. Their price was fair and their work was absolutely amazing! They completely transformed the beds on all sides of our house and planted new shrubs in one day! They cleaned up all the debris also. I am so impressed by their work ethic! I highly recommend them for any work you need to have done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by100%of homeowners
Avatar for Big Boyz Lawn & Landscape
Big Boyz Lawn & Landscape
5.0(
4
)

Serving Windfall, IN and surrounding areas

Credit card accepted

"I couldn't have been more satisfied with the work! They arrived on time and were quick to get to work, they did everything I asked for and then some when it came to the clean up. I would highly recommend this company!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by75%of homeowners
Avatar for Platform Decking & Landscaping
Platform Decking & Landscaping
3.2(
9
)

Serving Windfall, IN and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"Would definitely hire again, got the deck done on a timely manner and it is very quality. Also built a chicken copper. Sturdy and well built and done in one day. Will hire again for any work that needs done. Best crew and best price you'll find in the area."
Decks and Porches Project
Handymen Project
Decks & Porches Project
Decks and Porches Project
Decks & Porches Project

+40

Recommended by83%of homeowners
So Clean Exterior Cleaning
5.0(
2
)

Serving Windfall, IN and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"I've never seen a small business owner do a better job. The price was absolutely reasonable. The most impressive part? He took great care to shield my landscaping from the wash so it wouldn't be ruined! I encourage anyone in need of their homes, roofs, decks washed, give them a try! You WON'T be disappointed. Owner is great to work with and did a free estimate!"
Small Barn
Small Barn
Small Barn
Small Barn
Small Barn

+55

Recommended by100%of homeowners
Showing 1-10 of 41
Deck Maintenance questions, answered by experts

Most building codes require that spindles or balusters on deck and stair railings be spaced no more than four inches apart. This safety standard, often called the '4-inch sphere rule,' is designed to prevent small children or pets from slipping through the railing. A good way to visualize this is that a 4-inch sphere should not be able to pass between two spindles. For the same safety reason, the space between the bottom rail and the deck floor should also be no more than four inches. As a general guideline, professionals often install three balusters per foot of railing. However, since specific requirements can vary by location, it is crucial to check your local building codes to ensure compliance before starting your project.

No. In most cases, it’s not colder or freezing temperatures that affect decking materials but the amount of moisture that seeps into the materials as a result. For example, wood decking material is more likely to suffer from rot or decay when exposed to excess moisture from snow or ice. An extreme change in temperature can cause wood to expand or contract, but only if it’s not properly treated beforehand.

There are more pros than cons when staining a deck. Deck stain is more affordable than paint, it protects the wood and allows the natural textures to shine through, and it can revive the appearance of your home. However, deck stain also requires prep work (sometimes days or more), carries more upkeep than a painted deck, and can fade over time if not cared for. 

The life expectancy of deck boards varies widely based on the material, climate, and maintenance. Untreated wood boards typically last 10 to 30 years with proper care, while pressure-treated boards can last up to 50 years. Hardwoods generally outlast softwoods. Composite boards also tend to last longer than natural wood. Environmental factors like arid or humid climates can shorten a deck's lifespan. To extend the life of wood decking, it's important to consistently clean and seal it to protect against moisture, UV light, and insects.

Whether to paint or stain a deck depends on your personal preference for appearance and budget. Stain provides a natural look with a range of undertones, is typically less expensive, and may only require one coat, but it does not last as long as paint. Paint offers a sleeker finish with a virtually unlimited color palette. Both options will protect your deck from outdoor elements like rain, snow, and general wear and tear.

The Windfall, IN homeowners’ guide to deck maintenance services

From average costs to expert advice, get all the answers you need to get your job done.