Top-rated ceramic tile pros.

Best ceramic tile pros near Marion, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Marion, IN?

Select your specific project to find the pro for you.

TRUSTED BY MARION, IN HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon11
    Verified ceramic tile services reviews

Top-Rated Ceramic tile pros in Marion - Updated Nov 2026

Avatar for RS SURFACE COATINGS
RS SURFACE COATINGS
5.0(
17
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Marion, IN and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

Credit card accepted

"RS Surface Coating recently installed flooring for my kids bedroom. I was moving into the new home during the install and the team at RS Surface Coating were very accommodating to my schedule. The work was completed quickly with high quality. Iâ ll be recommending them to friends and family looking for flooring / coating installs. Great work done by the team"
Domino flake
Domino flake
Domino flake
Domino flakes
before flake system

+31

Response time3 hrs
Response rate97%
1 neighbors recently requested a quote
Avatar for Marblelife of Indianapolis
Marblelife of Indianapolis
4.9(
35
)
Tile: Ceramic and Porcelain - RepairTile: Ceramic and Porcelain - Repair- For Business

Serving Marion, IN and surrounding areas

In business since 2019

Free estimates

Warranties offered

"We were on the fence about doing a major remodel in our master bathroom. The tile was old looking and a little worn but was only 5-7 years old I’m guessing. We decided after many quotes to “refresh” the bathroom and try to get another few years out of our current set up. We called Marble Life because they offer the grout sealing service that would help us tremendously. Michael was very responsive and came out to quote the project after giving me a rough estimate over the phone. We chose some colors to make the tile look clean and fresh and coordinate with the new paint. He repaired the cracked/missing grout, cleaned the shower floor and removed the old grout and caulk (about five different repairs had been made it seems), and then applied some seal at to the shower floor to help it last longer. The whole process took about 1.5/2 days for my floor, tub area decking, backsplash, and shower. It looks clean and brighter... now I don’t cringe when I take a shower. If you’ve never sealed your grout, I HIGHLY recommend it. It’s a breeze to clean and resists mold. He also used the appropriate grout caulk around the perimeter where the wall and floor meet so that it won’t crack again with the settling of the house. I am going to use them again to seal my floor in the kitchen, entry, and laundry room. They do excellent work, excellent clean up, and are very professional. I couldn’t be happier!"
Our Work
Our Work
Our Work
Our Work
Our Work

+42

Response time2 days
Recommended by100%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Marion, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Abbott Stone and Tile
4.3(
6
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Marion, IN and surrounding areas

In business since 1996

Free estimates

Credit card accepted

"Abbott Stone and Tile did an amazing job of installing glass and stone tile on the wall between our set of floating shelves. It looks incredibly beautiful and they worked efficiently, finishing the job in less time than I would have guessed. Dave Abbott does not pawn off his work to less-skilled others; he wants the end-product to look fantastic and he assures that by maintaining a very high standard. And it was a great deal for the money! Thank you Abbott Stone and Tile!!!"
Recommended by33%of homeowners
Avatar for Xtream Tile Design & Flooring, LLC
Xtream Tile Design & Flooring, LLC
New to Angi
Tile: Ceramic and Porcelain - Install

Serving Marion, IN and surrounding areas

In business since 2016

Free estimates

We're a locally owned and operated company that values honesty, integrity and treats your home as if it were our own. We offer a variety of services that are customizable to each individual project. We specialize in Hard surface flooring such as Tile and Wood flooring installs, but also offer a wide range of expertise for a variety of other projects. We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction!

Shower
Shower
Backsplash
Backsplash
Tile floor

+2

Response time6 hrs
Keeley Flooring
5.0(
3
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Marion, IN and surrounding areas

In business since 1999

Free estimates

Credit card accepted

"Just had my floors done by Keeley Flooring. I had the old carpet in my bedroom/living room and hallway removed, plus they also installed beautiful laminate wood floors in my kitchen and dining room areas. Good customer service, pricing was very reasonable and I’m very pleased with the results! I provided before and after photos."
Response time5 days
Recommended by66%of homeowners
...
Showing 1-10 of 59
Ceramic Tile FAQs, answered by experts

The average cost for tile installation is about $2,000, with a typical price range between $500 and $6,500. On a per-square-foot basis, you can expect to pay between $5 and $45 for installation.

Several factors influence the total cost, including:

  • Installation Site: Costs vary for different areas. Common project costs are: kitchen floor ($870–$6,100), countertop or backsplash ($500–$3,000), bathroom floor ($300–$2,400), or shower wall ($225–$2,000).

  • Tile Type and Quality: The material significantly impacts price. For example, standard ceramic or travertine tile can cost about $1 per square foot, while luxury options like marble can be as much as $350 per square foot for the material alone.

  • Project Size and Complexity: The total square footage, the complexity of the pattern, and the shape of the tile (e.g., square, rectangle, hexagon, mosaic) will affect labor and material costs.

  • Site Preparation: The amount of prep work needed, such as removing old tile or installing a new subfloor or backer board, can add to the final price.

  • Tile Characteristics: The tile's durability rating and porosity can also influence the price.

  • Location: Labor rates vary by geographic location.

You can technically install tile over tile, but we don’t suggest it. Installing tile over any surface that isn’t a completely flat and prepared subfloor will result in a shoddy overall job, uneven flooring, tiles that don’t adhere, extra weight, gaps, cracks, and room for moisture and dirt to enter. For the best results, only install new tile on a flat, sanded surface like subflooring or concrete that is prepared for tile.

If you have asbestos tile and would rather tile over it than remove it, or if your existing tile is completely flat and bonded tightly to the floor, you may be able to tile over existing tile. But experts recommend thinking twice before you do.

Whether you want to match your tile trim with grout comes down to your personal preferences. If you match the two, it can help your tiles to stand out while providing a clean, cohesive look. On the other hand, you might opt to match your tile trim with your tiles. The best option will depend largely on your tile design, as well as how it fits overall with the rest of your room.

Grout and caulk are commonly used together, especially in bathrooms. Grout goes between the tiles and keeps them sturdy and in place on the walls or floor. Caulk goes in corners or where two different materials meet (like where the bathtub meets the tile) to create a waterproof seal. However, they are not interchangeable—you shouldn't use caulk to adhere tile and shouldn’t use mortar if you need a waterproof seal.

The tile spacing you should use will depend on the tile and where you’re installing it. Choosing the right tile spacers to maintain a consistent gap between your tiles is tricky. Generally, tile spacing shouldn’t be less than 2 millimeters on walls and 3 millimeters on floors because of stress relief requirements. Getting it wrong can result in uneven tiles and early repairs.

The Marion, IN homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.