Top-rated excavation pros.

Best excavation pros near Harlan, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Harlan, IN?

Select your specific project to find the pro for you.

TRUSTED BY HARLAN, IN HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon11
    Verified excavation services reviews

Top-Rated Excavation pros in Harlan - Updated Nov 2026

Avatar for MR. MILLER CONCRETE LLC
MR. MILLER CONCRETE LLC
4.9(
32
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Harlan, IN and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"Josh and his crew very professionally and friendly. I had old driveway and sidewalk removed, and new driveway and sidewalk replaced in under 6hrs . Josh always responding quickly with quotes and any questions I had. Very pleased with every aspect of the work they did and would definitely recommend."
Response time1 day
42 neighbors recently requested a quote
Recommended by96%of homeowners
...
Showing 1-10 of 63
Excavating FAQs, answered by experts

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

A joint utility trench, or joint trench, is a long, buried ditch on a property that contains two or more utility lines rather than running the lines in multiple trenches. Some utilities, like gas and electric or electric and communication lines, are better suited to joint trenching, while others, like water and sewer, are not allowed to be in the same trench.

It takes one hour to dig a 10-foot trench by hand. Use a trenching shovel with a sharp tip and a long head. Plan for more time if your soil is heavy or rocky. Consider renting a trencher if you’re digging a long or deep trench or if you have challenging soil or terrain. 

Preparation involves site assessment, clearing debris, grading surfaces, and compacting soil to support stable construction.

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.