Top-rated excavation pros.

Best excavation pros near Avilla, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Avilla, IN?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Avilla - Updated Nov 2026

Avatar for Your Guy Excavating, LLC
Your Guy Excavating, LLC
4.4(
5
)
Building Site - Preparation and ClearingLandscape - Minor Grading or ReslopingBuilding Site - Preparation and Clearing - For Business+2 more

Serving Avilla, IN and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"they give you a fast estimate and they are very nice gentlemen . they work real hard to get the job done . they applied for a permit for us to put river rock in front of our cottage along the waters edge . added lots of sand and topsoil and leveled it out . the all seeded it and put straw down. then came back to install a black chain link fence around our front yard including three gates. When they said they would be on site they were their at the time they said. they left no mess behind . and their estimate was the price we paid. i recommend them for any type of escavating , landscaping projects you may have . they also have a tree service and they removed a big cottom wood and a old willow and took out the stumps and all that was a better price then any other estimates i got. If you got work to be done they are the company to call."
Response time3 days
8 neighbors recently requested a quote
Recommended by100%of homeowners
Earth Moving Solutions, LLC
New to Angi
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Avilla, IN and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

Customer satisfaction is what determines our success, which is why we take a hands-on approach. When interacting with our company, you'll notice that we're particularly focused on the principles of quality workmanship, timely completion, competitive pricing and integrity in all our business dealings. We combine knowledge and research with our extensive practical experience to ensure a specialized approach for your project needs. Contact us today for a fair and accurate estimate of your project. We look forward to adding you to our long and growing list of happy customers. \n

Response time2 days
...
Showing 1-10 of 59
Excavating FAQs, answered by experts

In the United States, a depth of 36 inches (three feet) for underground water lines is the accepted industry standard. This depth varies from location to location based on local conditions. In areas with colder winters, they may be buried deeper to prevent frozen well water pipes : This is usually at least six inches below the frost level. The International Plumbing Code calls for a minimum of 12 inches below grade.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

Trenching is a specific kind of digging. Trenching means digging a depression in the earth that’s deeper than it is wide, often with heavy machinery. Digging refers to any kind of removal of earth in order to create a human-made depression, hole, or cut in the earth’s surface. You can dig with big tools or even with just a hand shovel.

Your contractor should handle dust control during the project. It's best to speak with your contractor beforehand to check if they plan to cover your furniture, protect your vents, or use fans to redirect dust. Eliminating drywall dust is a particularly large challenge during construction, so always take this into account during your planning phase.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Avilla, IN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.