Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Burlington, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Burlington, IN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Burlington

Avatar for The Blacktop Guy
The Blacktop Guy
4.8(
40
)
Asphalt Sealing

Serving Burlington, IN and surrounding areas

Approved

In business since 2002

Free estimates

Customers say: Quick response

"He did a great job on our big driveway and our neighbor hired him on the spot because he was so impressed with the job he did for us. We will have him back in the future for maintenance on our driveway."
Work photo’s
Work photo’s
Work photo’s
3
4

+22

Response time8 hrs
Response rate85%
24 neighbors recently requested a quote
Avatar for Silvers Concrete and Paving, LLC
Silvers Concrete and Paving, LLC
4.2(
12
)
Concrete Driveways - Install

Serving Burlington, IN and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

"The approach to the road they poured for us is beautiful, but it wasn’t quite angled properly for the existing driveway. That is the reason for docking half a star. Now our drive looks like it has a kink in it. Other than that we are happy with it. Haven’t been able to drive on it yet since we are still in the 21-day waiting period."
Driveway
Driveway
Stamped Patio
Stamped Patio
Brushed Patio

+2

Response time4 hrs
Response rate96%
Recommended by80%of homeowners
Avatar for Prairie and Company Paving, LLC
Prairie and Company Paving, LLC
3.6(
41
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Burlington, IN and surrounding areas

In business since 2007

Free estimates

Warranties offered

"This company did an oustanding job! Our driveway looks absolutely beautiful! The owner was highly responsive and prompt. I talked to him on Thursday and had a brand new driveway on Tuesday. Thank you so very much! Definately worth 5 stars, if not more!"
Before
Before
After
After
After

+54

Response time2 days
Recommended by66%of homeowners
...
Showing 1-10 of 90
Asphalt Driveways questions, answered by experts

Yes, using recycled asphalt millings is an eco-friendly alternative compared to concrete. Millings are reclaimed pieces of gravel that are recycled into aggregate that can be used on driveways, patios, walkways, basketball courts, tennis courts, and more.

Sometimes, when people talk about asphalt driveways, they’re actually referring to asphalt concrete, which is a completely different compound. Asphalt concrete is asphaltic cement combined with sand or grit. It is significantly more lasting and durable than regular asphalt but also much more expensive. If you’re considering using asphalt concrete, ask an asphalt company for their expert opinions.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Burlington, IN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.