Top-rated paving pros.

Get matched with top paving pros in Metropolis, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Metropolis, IL?

Select your specific project to find the pro for you.

Find Paving pros in Metropolis

Avatar for Omega Earthworks
Omega Earthworks
5.0(
1
)

Serving Metropolis, IL and surrounding areas

In business since 2019

Free estimates

Emergency services offered

We have the experience and we are committed to providing quality workmanship and superior customer service on all our applications. We at Omega Earthworks strive to maintain our reputation as a high quality, very service oriented company with our main focus being customer satisfaction.

Recommended by100%of homeowners
Showing 1-10 of 26
Paving Services questions, answered by experts

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

Many asphalt companies have experience with tar and chip paving, but not all. The process is unique enough—and not incredibly common enough—that you may have to look around for a tar and chip specialist. However, speaking with a driveway company is a great place to start, especially if they have experience with multiple materials.

The ideal distance between stepping stones depends on your design preference. A general rule is to place them about 24 inches apart from center to center to match an average person's stride. Another common approach is to leave about 6 inches of space between the edges of each stone; this can be adjusted to fit the path's total length without cutting pavers. If you plan to plant between the stones, leave at least 6 to 8 inches of space to give the plants room to grow.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Yes, but it's best to kill off the grass with solarization and remove the dead plant matter before laying down the pavers. This helps limit the chance of your pavers shifting as the dead plant matter decomposes.

The Metropolis, IL homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.