Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Golden, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Golden, IL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Golden

Avatar for Tri-State Land Services & Construction Company, LLC
Tri-State Land Services & Construction Company, LLC
4.6(
38
)

Serving Golden, IL and surrounding areas

Approved

In business since 2015

Free estimates

Warranties offered

"Jacob and his assistant, Jaydon, went out of their way to provide what I would call World Class Customer Service. Their work was very professional. In fact, Jacob assisted me with some landscaping which wasn't part of his original bid as a goodwill gesture at no extra charge. I was very satisfied with the outcome of this project."
Stepped privacy fence
Stepped privacy fence
Stepped privacy fence
Ewing mo
Ewing mo

+31

Response time3 days
5 neighbors recently requested a quote
Recommended by83%of homeowners
Agape Construction & Improvement
4.0(
60
)

Serving Golden, IL and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"

Brady is the best you'll ever find for home remodeling projects.
Showed up on time. Took the time to make ever job right.
Projects were worked on over a number of months, one at a time.


The best and most honest tradesmen I've ever found.
We moved to Texas in January of 2014.  We whish Brady could have come with us.
I've found some good (and bad) people to work on the Texas home.  But no one who comes close to the quality of work done by Brady Brower.
"
Additional Photos
Additional Photos
Additional Photos
the home owners are very happy!
all done!!

+1

Recommended by90%of homeowners
Avatar for American Custom Homes
American Custom Homes
5.0(
3
)

Serving Golden, IL and surrounding areas

In business since 2000

Emergency services offered

Credit card accepted

"I would like to start off with precise, warm welcome and highly responsible of what they are doing. They really know what they are doing and from start from start to end it has been a great project with new experiences and great craftsmanship. Thanks again guys and i hope to have more work for you soon...
"
Stone Travertine
12x6 Travertine hand cut
Complete Steamer
Recommended by100%of homeowners
Showing 1-10 of 43
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

The Golden, IL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.