Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Annis, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Annis, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Annis

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Annis, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for Little John's Plumbing LLC
Little John's Plumbing LLC
5.0(
2
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Annis, ID and surrounding areas

Emergency services offered

Credit card accepted

Plumbing service and repair,water heaters, water softeners, recipes, remodels.We guarantee your satisfaction and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out our services offered and call or click to schedule a free estimate today.

Home addition
Home addition
Home addition
Home addition
Home addition

+18

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

In combination with adequate filtering and water chemical balance, vacuuming will keep your pool from being overrun with algae. If your pool is experiencing algae growth, the same combination will get rid of it with a bit of patience. Heavy algae growth may require the use of an algaecide, and in some cases, you’ll want to vacuum the pool 24 to 48 hours after using algaecide to remove dead algae debris.

Pool leak detection dye is a great way to test specific areas of your pool for unbalanced water flow. By releasing the dye close to possible trouble areas—like around the seal of the skimmer—you can narrow down the potential crack. However, it's best to call a professional pool repair team near you if an initial patch does not keep your water level from lowering.

It can take 24 to 48 hours to fill a 15,000-gallon pool with a garden hose. A hose will pump out anywhere from 4 to 12 gallons per minute, with the average hose resting somewhere between 8 to 9 gallons per minute. If you want to speed up the process, a water delivery service can fill your pool in a few hours or less.

It depends. Your pool might need chlorine every day if the water is exposed to direct sunlight and you use your pool frequently. UV light and constant use will deplete chlorine levels more rapidly. Test your water regularly to see where your levels sit and adjust accordingly. Generally speaking, most homeowners need to add chlorine following a water chemical test about one to three times per week.

The Annis, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.