Top-rated basement remodelers.

Get matched with top basement remodelers in Lincoln, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Lincoln, ID?

Select your specific project to find the pro for you.

TRUSTED BY LINCOLN, ID HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon27
    Verified basement remodels reviews

Find Basement remodelers in Lincoln

Avatar for ELEMENT ELITE LLC
ELEMENT ELITE LLC
4.9(
42
)
Basement - Remodel

Serving Lincoln, ID and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Partial basement completion. Created a bedroom, a bathroom, and a storage room in our unfinished basement. Fantastic work and very, very fast. We had a certain timeline, we knew it would be tight, but the Elite team worked it in around previously schedule jobs and got it done. Everything is beautifully done and we greatly appreciate the excellent work. The entire crew was courteous, extremely knowledgeable, and very professional, making sure we were satisfied all along the way. Great job!"
Response time2 days
Response rate94%
21 neighbors recently requested a quote
Avatar for H and E Construction, LLC
H and E Construction, LLC
3.1(
20
)
Basement - Remodel

Serving Lincoln, ID and surrounding areas

Approved

In business since 2000

Free estimates

Customers say: Terrific value

"I have hired Steve Ellis twice. Once was two years ago and the other was just this week. Both times he tore out floor tile that was installed incorrectly and then installed new floor tile. The first time was in the laundry room. Ditra mat was originally under the tile and was not thinset to the floor. So the tile was moving and grout was coming out where the traffic areas were. Tile came up in whole pieces. The second time Steve came he tore up the existing tile in the pantry, spare bath and master bath. All of which was incorrectly installed by someone else. Steve and Jeff installed new tile with backer board underneath. They did an excellent job! It looks beautiful! Very professionally done. I know, now, that my tile will NOT move because it is installed correctly. I would not use anyone else to do any work that I need done. The pricing is fair, the resulting work is excellent and they were on time each day and completed the job when they said they would. I couldn't have asked for a better job from Steve and Jeff. I have had very bad experiences with OTHER contractors in the past 40+ years. So I know a good/excellent job when I experience it."
Response time12 hrs
Response rate100%
Recommended by69%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Lincoln, ID and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Tahr Builders, LLC
Tahr Builders, LLC
5.0(
6
)
Basement - Remodel

Serving Lincoln, ID and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Jeremy is wonderful to work with. He finished our flooring quickly and did a remarkable job. His pricing was fair and affordable; we highly recommend this company."
Response time8 hrs
Response rate88%
Recommended by80%of homeowners
Showing 1-10 of 30
Basement Remodel questions, answered by experts

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Lincoln, ID homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.