Top-rated basement remodelers.

Get matched with top basement remodelers in Iona, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Iona, ID?

Select your specific project to find the pro for you.

TRUSTED BY IONA, ID HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon40
    Verified basement remodels reviews

Find Basement remodelers in Iona

Avatar for ELEMENT ELITE LLC
ELEMENT ELITE LLC
4.9(
38
)
Basement - Remodel

Serving Iona, ID and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"We are so happy to have our basement competed. James and his crew finished our basement by drywalling, painting, trimming out windows, door frames and i stalling doors. It looks great!"
Response time2 days
Response rate94%
41 neighbors recently requested a quote
Avatar for H and E Construction, LLC
H and E Construction, LLC
3.1(
20
)
Basement - Remodel

Serving Iona, ID and surrounding areas

Approved

In business since 2000

Free estimates

Customers say: Terrific value

"Steve Ellis of H&E constructions in Rigby serves Idahofalls or the upper snake river valley. He showed up on the scheduled time each day, finished my project on time, on budget with exceptional craftsmanship. I am fairly picky wife is worse. He pleased us both. Kept the construction site cleaned up. Recommended improvements that made sense and in a couple items actually saved me some money. I would strongly recommend this company. At a minimum put Steve on your list when researching contractors. He can also do full basement remodels because I spoke with him at length on what I may be doing in the future. I don't plan to interview anyone else when I proceed. If you readers are not getting that this is a top notch pro, that's my back in not expressing how well he worked for me. Look at H&E (Steve Ellis) for any remodel projects."
Response time12 hrs
Response rate100%
Recommended by69%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Iona, ID and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Tahr Builders, LLC
Tahr Builders, LLC
5.0(
6
)
Basement - Remodel

Serving Iona, ID and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Jeremy is wonderful to work with. He finished our flooring quickly and did a remarkable job. His pricing was fair and affordable; we highly recommend this company."
Response time8 hrs
Response rate88%
Recommended by80%of homeowners
Showing 1-10 of 28
Basement Remodel questions, answered by experts

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The Iona, ID homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.