Top-rated basement remodelers.

Get matched with top basement remodelers in Marion, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Marion, IA?

Select your specific project to find the pro for you.

TRUSTED BY MARION, IA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon27
    Verified basement remodels reviews

Find Basement remodelers in Marion

Avatar for Hixson Contracting LLC
Hixson Contracting LLC
5.0(
8
)
Basement - Remodel

Serving Marion, IA and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Credit card accepted

"My bathroom renovation was completely done in just a few days. The guys were knowledgeable and hard working as well as friendly. I have more projects that I will definitely be having done by them. Hixson contracting is also very reasonably priced. I would highly recommend them to anyone needing work done."
My Jobs
My Jobs
My jobs
My jobs
My jobs

+3

Response time1 day
Response rate89%
23 neighbors recently requested a quote
Avatar for JB Construction and Handyman Services
JB Construction and Handyman Services
4.1(
35
)
Basement - Remodel

Serving Marion, IA and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"New walls were built using paneling that matched existing paneling.  I had asked for a 3-foot-high box with removable or hinged lid to be built around the sump pump to keep the cat from playing with it; Jamie recommend a closet instead of a box, which was acceptable to me, and will prove to be a better choice when I have the sump pump discharge rerouted away from sanitary sewer.
Sump pump failed overnight during construction.  I had not moved in yet, so I was glad that the workers altered me.  With my authorization they had a new sump pump installed, removed the soaked carpet, and ran dehumidifiers to dry out the basement.
One door was installed opening opposite my request, but this was too minor a detail to ask for a correction.
New doors and trim were stained and varnished, and all messes were cleaned up completely.  Very happy with the work.  Solar tube (skylight) in bathroom is wonderful!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Recommended by83%of homeowners
Avatar for Modern Edge Construction
Modern Edge Construction
4.3(
39
)
Basement - Remodel

Serving Marion, IA and surrounding areas

In business since 1990

Free estimates

Emergency services offered

"There aren’t enough words to express how happy we are with Cade and Modern Edge Construction! Cade helped us finish our basement and lay down new flooring on the main level. He was at our house within 24hrs to give us an estimate and started working on the house the very next day! Cade always communicated the plan, was extremely fair with pricing, and took a lot of pride in his work! We have a couple more projects and can’t wait to work with him again! Highly recommend! 😃"
7
2
5
1
3

+29

Response time2 days
Recommended by75%of homeowners
ClassiConcrete
3.9(
56
)
Basement - Remodel

Serving Marion, IA and surrounding areas

In business since 1999

Credit card accepted

"John gave me what I thought was a decent estimate that was in line with everyone else. He gave me a date for the work to be completed, but they didnt arrive on that date. On that they that they didn't arrive, I had cancelled an appointment to stay home that morning. When I called him, he was in Iowa working at his other location. When I let him know that I had cancelled an appointment to be here for the work, he said "Did we inconvenience you?" in an unfriendly tone. The crew came to do the work on a weekend. John is not a good communicator at all. John had told me that he was going to resurface the floor. I did not understand what that meant and assumed it was putting in new concrete because he did not explain it. I saw that the crew was just chopping up the floor and going to fill in the cracks. When I stopped them and contacted John, he said he had it noted down as resurfacing. When I explained to him that the he did not explain what resurfacing meant to me, he got upset and said I had to pay more. He first said the job would cost an extra $800. When I declined it, he offered the work to be done at an extra $400. After the job was complete, it was done nicely. When I advised him how many companies on Angie's List offer discounts to members, I asked what type of discount he offered. He said that he would add some decorations to the sidewalk and that was done. Also, when I saw that dirt needed to be replaced in the trenched along each side of the driveway and sidewalk, he said I would need to call someone else. I had to pay another contaractor $300 for the dirt to be filled after they finished the driveway and sidewalk. The work took three days and he only stopped by once to oversee the job and that was when we had the arguement over the garage floor. The product and quality of service was good, but the communication was bad. The workers did a good job and they worked hard. However, I would not recommend this company to someone else as I felt that dealing with John was not appropriate. He didn't offer good customer service in what I see in terms of what I feel is appropriate customer service for what a person would normally expect.
"
Additional Photos
Additional Photos
Stamped
Polish
Stain

+1

Recommended by82%of homeowners
Showing 1-10 of 40
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

The Marion, IA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.