Top-rated paving pros.

Get matched with top paving pros in Farley, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Farley, IA?

Select your specific project to find the pro for you.

Find Paving pros in Farley

Avatar for Stone's Dirt & Wood
Stone's Dirt & Wood
5.0(
2
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Farley, IA and surrounding areas

In business since 2021

Free estimates

Offers commercial services

"Customer-focused. Dependable. Detailed. Hard-working. Amiable. Trustworthy. Superb integrity. We experienced all of these traits from Keith and Donna when we hired them for our driveway project. The end result is beautiful, they delivered exactly what we wanted, and they definitely exceeded our expectations! Couldn’t be more pleased!"
First conex box
Second conex box
Conex boxes
Conex boxes
Conex boxes

+44

Response time3 days
Recommended by100%of homeowners
C.W. Construction
3.0(
29
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+2 more

Serving Farley, IA and surrounding areas

In business since 1995

Free estimates

Credit card accepted

"Great company with excellent craftsmanship. Came out and gave an estimate and started the job soon after the contract was signed. They were one of the best companies out of the 3 that we had come out. I would definitely recommend these guys to do any driveway work you need"
Response time2 days
Recommended by80%of homeowners
All In One
5.0(
4
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Farley, IA and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"My first experience on Angie's List was to find a contractor to repair a leaking roof.  When I purchase my home the roof had been replaced within 2 years of purchasing.  Yet within a year water was leaking into my living room.  When other contractors came out they'd stand in the driveway and look up at the roof, then tell me all I needed were new gutters, which didn't help. All in one actually got up on the roof to investigate determining where my roof was leaking and fix it. With their estimate they provided proof on insurance and state contractor certification.  Before the roof work commenced,  rain was forecast All In One, covered the roof with tarps.  Once the work was completed they cleaned up the yard and driveway of all the old tiles, nails, and other debris.  Shortly after they completed there work, it rained again.  I held my breath but no water came dripping down from the ceiling.  In addition to the roof, since they were going to be up on the roof, I had them replace an old skylight.  No, the skylight wasn't the cause of the leak, I just took advantage of the opportunity to replace it.
"
Recommended by100%of homeowners
Showing 1-10 of 12
Paving Services questions, answered by experts

If your new pavers look dull or unclean, it is likely due to efflorescence, a chalky, white powder that forms when lime in the pavers gets wet. This condition often resolves on its own, as rain will naturally wash it away within about a year. For faster results, you can use a pressure washer to clean the pavers. Alternatively, consider using cleaning products specifically designed to remove efflorescence or applying sulfuric acid crystals.

To adhere pavers to concrete, you can use either mortar or a concrete-specific adhesive. For border pavers, a polyurethane-based adhesive is a good choice as it expands and contracts with temperature changes, keeping them firmly in place. For the non-border pavers, polymeric sand is used between the joints to prevent shifting. In most cases, it is also recommended to lay a permeable sand layer below the pavers to ensure proper stability and drainage. Before starting, always take the proper preparatory steps for a professional result.

An asphalt driveway should be at least 3 inches thick over a compacted gravel base. Areas with poor drainage should have a thicker stone base. To install a new asphalt driveway over an existing driveway, the new asphalt should be at least 2 inches thick and the existing driveway should be in relatively good condition.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The Farley, IA homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.