Top-rated basement remodelers.

Best basement remodelers near Durant, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Durant, IA?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Durant - Updated Nov 2026

Avatar for QC Remodeling LLC
QC Remodeling LLC
5.0(
6
)
Basement - Remodel

Serving Durant, IA and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"QC Remodeling did a great job on my bathroom remodel at a fair price. Work was done on time and they took great care to protect areas outside of work area from dust and dirt. I would highly recommend them!"
Le Claire, IA Kitchen Renovation
Sherrard, IL High end Bathroom Remodel
Additional Photos
Additional Photos
Additional Photos

+62

Recommended by100%of homeowners
Avatar for PSD Home Improvement, LLC
PSD Home Improvement, LLC
4.6(
9
)
Basement - Remodel

Serving Durant, IA and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"Did an absolutely amazing job on my basement, our basement was originally unfinished and Chris helped us with the layout and got everythig done for us! His crew were extremely respectful and professional, will definitely hire again"
Shower Replacement
Final product
Framing
Final product
Flex space

+17

Response time1 day
Response rate100%
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Durant, IA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 26
Basement Remodel FAQs, answered by experts

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Durant, IA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.