Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Doon, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Doon, IA?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Doon

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Doon, IA and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

While salt water pools are slightly more expensive to install and run, they offer a better experience with less irritation to the skin, eyes, and even hair. Salt water is also less harsh on swimsuits and pool accessories. As a result, some homeowners feel the extra expense is worth it.

The formula you’ll use to measure your pool will differ based on the shape of your pool. For a rectangular pool, you’ll use the following formula to find the size in gallons: length x width x depth x 7.5. If the depth changes from one end of your pool to the other, take the average by finding the depth at the deepest and most shallow points and dividing that number by two. Circular and oval pools require different, more complicated formulas, which can be found in this article.

Building an inground pool is a job best left to the pros. Excavating the area and building the pool requires heavy equipment and specialized training, and pools have complex plumbing and electrical systems. Unless you’re experienced in these areas, you’re better off hiring a pool contractor to make sure the job gets done safely and correctly. 

Once you use a pH decreaser, you can expect the pH to adjust in two to four hours. If you use a strong chemical like muriatic acid, it could take as little as an hour. Either way, it’s best to wait for a full turnover cycle before retesting. You want to make sure the chemical is completely dissolved and evenly distributed or you won’t have a stable pH level.