Top-rated subcontractors.

Get matched with top subcontractors in Sylvania, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Sylvania, GA?

Select your specific project to find the pro for you.

TRUSTED BY SYLVANIA, GA HOMEOWNERS

  • Average homeowner rating star icon3.8
    Average homeowner rating
  • Verified reviews icon23
    Verified subcontracting services reviews

Find Subcontractors in Sylvania

Avatar for AAA Basement Waterproofing
AAA Basement Waterproofing
4.8(
83
)
Major Home Repairs (General Contractor)

Serving Sylvania, GA and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"Jeff told me the foundation settling was very minor for a house built in the 1970's.  No water problems in basement.  He did recommend I have the gutters replaced, with 6" gutters, and to make sure water is draining away from house.  Also, he asked me to contact him if the foundation settled more in the future.  He did not do any work other than give me a free evaluation.  Jeff was very professional and honest. I will definitely use his company if I have anymore foundation or drainage issues.
"
Full Interior Encap Sys
Full Interior Crawl Drainage Sys
Before Crawl Drainage System
Before Sub-Floor System
After Sub-Floor System

+5

Recommended by100%of homeowners
Avatar for Backyard Custom Construction LLC
Backyard Custom Construction LLC
4.4(
15
)
Major Home Repairs (General Contractor)

Serving Sylvania, GA and surrounding areas

In business since 2007

Emergency services offered

Credit card accepted

"This was our second project built by Backyard Construction. We had been so pleased with a 10x12' garden shed they built for us in 2012 that we had them build our art studio as well.  Once again, they did an outstanding job. We could not be more pleased with both buildings. Their part of the studio project involved constructing the shell of the structure; my husband and I, our electrician and our painter then finished the interior
We've used Backyard Construction because the quality of their buildings is excellent. After looking at dozens of other companies' offerings it was easy to see that Backyard used better materials and offered a higher level of workmanship yet was still very competitive pricewise. The studio is now one year old and the garden shed is two years old, and neither building has presented any problems whatsoever.
Construction began on time and was completed right on schedule. Their crew was courteous and extremely efficient. Dustin was a pleasure to work with. He was very responsive to our ideas and did an excellent job following up to make sure we were happy with everything. Working with Backyard Construction was a very positive experience for us each time, and we're more than happy to recommend them to others.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by80%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

It is technically possible to draw your own blueprints, but the process is extremely involved and really demands help from an expert. A professional architect has an understanding of design elements, interior design, the functionality of different rooms in a home, and how everything from furniture, outlets, and light switches should be laid out to serve you and your family best. Hiring an architect for blueprints can get expensive, but it’s the most responsible way to begin a new construction project. If you’re keen on DIYing, you could consider starting the process and then having a professional take over.

Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.

Costs depend on project complexity, materials, labor, permits, and required revisions.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Sylvania, GA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.