Top-rated excavation pros.

Get matched with top excavation pros in Old Town, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Old Town, FL?

Select your specific project to find the pro for you.

Find Excavation pros in Old Town

Avatar for The Brothers Trim
The Brothers Trim
4.9(
27
)
Landscape - Minor Grading or Resloping

Serving Old Town, FL and surrounding areas

In business since 2019

Free estimates

"They did an amazing job on exterior painting. Also, I got them to do the landscaping job as well, and they did an amazing job. Very friendly and prompt."
Back
Side before
Back yard before
Back corner before
Oak limb on a house

+38

Response time3 hrs
Response rate90%
Recommended by100%of homeowners
...
Showing 1-10 of 61
Excavating questions, answered by experts

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Excavation is priced in cubic yards, so you’ll need to find the volume of the area in order to calculate costs. Multiply the length, width, and proposed depth of your excavation site, then convert it into yards to get the volume. Multiply this figure by the price per cubic yard.

Most homeowners can measure by hand to get a rough estimate, even if it’s tedious. You may want to pull out a tape measure or use a string to help mark the area.

To locate an underground downspout, you should start by identifying where the above ground gutter drains. Look for an entry point, such as a pipe or elbow leading into the ground. Follow the surface path for signs like depressions, landscaping disruptions, or wet areas after rain. You can use a metal detector or plumber’s snake to trace the pipe underground. For deeper pipes, a professional locator tool or camera inspection may be necessary. Visual markers or utility maps can also guide the search.

Maintain open communication and address issues as they arise, ensuring contract terms cover potential delays.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Old Town, FL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.