Top-rated solar panel pros.

Get matched with top solar panel pros in Live Oak, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Live Oak, FL?

Select your specific project to find the pro for you.

Find Solar panel pros in Live Oak

Avatar for Florida Electric & Solar LLC
Florida Electric & Solar LLC
4.7(
49
)
Solar Panels For Electric System - RepairSolar Panel Install

Serving Live Oak, FL and surrounding areas

Approved

Super Service Award Winner

In business since 2008

Free estimates

Credit card accepted

"Not only did they do a great job installing my solar panels, but the whole team showed up each day in a professional manner and were very knowledgeable! Would definitely recommend them to anyone looking to make the switch to solar!"
Solar Panel Install
Solar Panel Install
Solar Panel Install
Solar Panel Install
Solar Panel Install

+1

Response time6 days
16 neighbors recently requested a quote
Recommended by48%of homeowners
Avatar for ADT Solar
ADT Solar
4.4(
111
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Live Oak, FL and surrounding areas

In business since 2008

Free estimates

Warranties offered

"Rep. checked entire system. He found several wires not connected properly and fixed this. He also made recommendations regarding the attachment of the panels to the rood that would provide more stability and leakproofing. The representative appeared to know what he was doing - much better than others, including the representative who was engaged by the roofer (who replaced our rood due to hail damage) to disconnect/connect the panels."
11 kW PV Installation
5 kW PV Installation
9.5 kW PV Installation
Recommended by89%of homeowners
Avatar for All American Solar LLC
All American Solar LLC
4.6(
10
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+5 more

Serving Live Oak, FL and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"Brandon Bing and Steve Lorenz are owner-operators and I found both of them to be skilled in their trade, honest and hardworking The installation of the water heater and solar panels went well and any bumps were smoothed out. I am initially disappointed in the Solar array's electric impact but I have a few trees that I need to take out and I still need to get my FPL net metering installed. At times I am producing more than what I consume so until I get net metering installed I cannot capitalize on overproduction. These comments are in no way a reflection on All American Solar for their work ethic or products. In fact, the array is expandable so that I can add more panels in the future. The Solar hot water heater is fantastic and has saved me about $60 per month off my electric bill. I would gladly recommend All American Solar for your solar panels or a solar hot water project and I would hire them again."
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5

+11

Recommended by90%of homeowners
Showing 1-10 of 25
Solar Panels questions, answered by experts

Solar well pumps range from needing 200 watts of power to as much as 12,000 watts for heavy-duty pumps. Since the most common and cost-friendly solar panels are 100-watt panels, you’ll need between two and 12 panels. The average is between two and eight panels for standard pumps. Based on the average cost of solar panels ($1 to $1.50 per watt), you’d pay between $200 and $1,800 for your well pump solar panels—not including installation.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The average homeowner needs around 22 solar panels, but the exact number depends on your monthly energy consumption. Your solar professional should size your array to offset your consumption, meaning you’ll need fewer panels if you use below-average amounts of electricity, or more than 22 if you use above-average amounts of electricity. The number of panels also depends on the output of each panel. The average is around 400 watts, but you might need more panels if you install less capable equipment. Since there are so many variables, you should have a professional size your system.

Professionals use the same methods to install solar shingles that they do for asphalt shingles, so you’ll often see a similar installation timeline of one to two days. The amount of time required will depend on the size and slope of your roof and the number of shingles installed. Weather conditions can delay installation, as working on a roof is unsafe during high winds or heavy rain.

The Live Oak, FL homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.