Top-rated subcontractors.

Get matched with top subcontractors in Cross City, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Cross City, FL?

Select your specific project to find the pro for you.

TRUSTED BY CROSS CITY, FL HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon44
    Verified subcontracting services reviews

Find Subcontractors in Cross City

Avatar for Martinez Wood Floors Inc
Martinez Wood Floors Inc
4.5(
169
)
Major Home Repairs (General Contractor)

Serving Cross City, FL and surrounding areas

In business since 1999

Free estimates

Credit card accepted

"At first, we thought that they were just going to repair the existing wood floor, but after talking to the owner, he said that there was a room that had to be replaced entirely because the planks were in very bad conditions. They got us a great price on the new Oak floor and store it in their warehouse until it was ready to be installed. We thought the process was going to be messy but it was not! They handled everything very carefully, protected our furniture, and vacuumed the area after they sanded the floors, which is pretty much the hardest part. We did a natural refinishing, no color change because we love the natural look of our White Oak Floor. It’s has been amazing to hear all the compliments our floors get from friends and family. Wonderful people to work with. Very friendly and affordable."
Additional Photos
MWF
MWF
MWF
MWF

+214

Recommended by94%of homeowners
Showing 1-10 of 37
Subcontractors questions, answered by experts

Professionals optimize layouts, improve energy efficiency, and ensure structural safety and compliance.

Italianate architecture is a reinterpretation of Renaissance styles, combining elements of Italian farmhouses and villas with Victorian materials and construction. This home style emerged in the Victorian era, gaining popularity in the U.S. in the mid-to late-1800s. The style came about in response to what many then viewed as the too-rigid and stuffy Classical style designs. 

If your project is complex, it may make sense to hire an architect to draw plans. An architect might also be a good person to hire if you want to ensure your plans adhere to building codes and regulations.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

The Cross City, FL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.