Top-rated subcontractors.

Get matched with top subcontractors in Branford, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Branford, FL?

Select your specific project to find the pro for you.

TRUSTED BY BRANFORD, FL HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon209
    Verified subcontracting services reviews

Find Subcontractors in Branford

Avatar for Martinez Wood Floors Inc
Martinez Wood Floors Inc
4.5(
169
)
Major Home Repairs (General Contractor)

Serving Branford, FL and surrounding areas

In business since 1999

Free estimates

Credit card accepted

"We hired Martinez to restore our floors and staircase. They are professional and extremely knowledgeable when it comes to wood floors. Honest man and will charge you what he needs to do a good job. I have been on the construction industry for a few a years now, I know what to look for in a company when I am doing a remodeling. I can tell you that Mr. Martinez answered every single one of the questions I threw at him with concrete answers, demonstrating his knowledge and experience. He was on time to provide the estimate and took his time to go over the floors in detail. Fellow homeowners need to pay attention to this, if a contractor takes the time to explain you things and review the job with you, it's a good sign. I also have to say that this was the third company we asked an estimate from. The first company wanted to replaced the whole floor, which I knew it was a rip off. The second one gave us an insane price like if money was grown on trees. However, Martinez was very reasonable in price and what we like was that since the first time he saw the project, he told us that the floor will look like new with a hard sanding. We moved everything out of the house, my suggestion is to hire a moving company, that way you make sure your furniture and belongings are well take care of. The crew is also very nice and respectful, will pay attention to detail, and will clean after they finish. The sanding is the worst part, but it's not something you can't tolerate; they have machines that make little dust, trust me, we stayed in the house and my wife is allergic to everything. When that part is done, everything else is a breeze. At the beginning, we were going to leave it natural, but my wife decided she wanted to stain the floor. So we chose and Ebony color, very gorgeous. We really like it a lot. The job took around 7 days to be completed and the floor really look amazing. We are very content with our new-looking hardwood flooring and we really appreciate everything Martinez floor did to make it happen. We'll be referring them to friend and family for sure."
Additional Photos
MWF
MWF
MWF
MWF

+214

Recommended by94%of homeowners
Shillem Specialties Inc
4.7(
13
)
Major Home Repairs (General Contractor)

Serving Branford, FL and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"Tim was very responsive from day one.  The job was on a cabin about 3 hours from where I live and he updated me regularly on the progress of the work. With the rain we have had this summer, the job turned into much more than he had bargained for (or quoted for)...but he stuck with it until the job was completed.  The work he did for me turned out great and I would highly recommend him to anybody looking for a hard working and honest contractor who does excellent work.
"
Side View
Front View
Entry Door
Aluminum Roof System
Before

+15

Recommended by100%of homeowners
Showing 1-10 of 49
Subcontractors questions, answered by experts

When conducting space planning, building codes and regulations need to be considered. As long as you are taking them into account and discussing them with the architect, you should be able to do your space planning appropriately.

When planning a general remodeling project, it's important to define the scope of work, understand your goals, and set a clear, detailed budget. You should also assess the current structure and consult with professionals like architects or contractors. Create a realistic timeline for each phase, obtain any necessary permits, and build in contingency plans for potential delays or unforeseen issues. Regular communication with all involved parties is crucial to streamline the process.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The costs depend on the type of wood, labor, roofing material, permits, and whether additional storage or enclosed walls are included.

The Branford, FL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.