Top-rated ev charger installation pros.

Get matched with top ev charger installation pros in Ledyard, CT

Enter your zip and get matched with up to 5 pros

Need a pro for your ev charger installation project in Ledyard, CT?

Select your specific project to find the pro for you.

TRUSTED BY LEDYARD, CT HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon240
    Verified ev charger installation services reviews

Find Ev charger installation pros in Ledyard

Avatar for Biagiarelli Electric
Biagiarelli Electric
5.0(
8
)
Electric Vehicle Charging Station Installation - Materials Provided by ConsumerElectric Vehicle Charging Station Installation - Materials Not Provided

Serving Ledyard, CT and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"If you are looking for an excellent electrician, start with this company first! I found Ben to be knowledgeable and professional. He did an inspection of our electrical issues and came back promptly and took care of the repairs. He made sure that everything was safe. I also feel that he did not overcharge me. He promptly provided a report to the Bldg Inspector, which was required for occupancy after our fire."
Our Projects
Our Projects
Response time5 hrs
28 neighbors recently requested a quote
Recommended by71%of homeowners
Avatar for JL Electric LLC
JL Electric LLC
5.0(
6
)
Electric Vehicle Charging Station Installation - Materials Not ProvidedElectric Vehicle Charging Station Installation - Materials Provided by Consumer

Serving Ledyard, CT and surrounding areas

Approved

In business since 2008

Free estimates

Emergency services offered

"Great job wiring up a hot tub. Very thorough. When it turned out that our existing GFCI was bad, Jared was willing to wait while I hustled out to buy a replacement, and then took the time to get it installed in the undamaged side of the breaker box. He even helped get the hot tub primed (and it was stubborn!). I highly recommend him."
Tesla Charger Install
Tesla Charger Install
Generator Transfer
Generator Transfer
Outside lights

+2

Avatar for CHB Contracting LLC
CHB Contracting LLC
5.0(
5
)
Electric Vehicle Charging Station Installation - Materials Provided by Consumer

Serving Ledyard, CT and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

The 12-month subscription allows you to consistently build your customer base and benefit from the ongoing exposure to homeowners on the Angi platform, ensuring a steady stream of homeowner-chosen leads. This frames the subscription as a benefit rather than just a requirement.

Excavation
Recommended by100%of homeowners
Showing 1-10 of 32
Ev Charger Installer questions, answered by experts

You can plug your electric car into a regular 120-volt household outlet only if you’re using a Level 1 charger. This method is slower and may take several days to fully charge your EV. For faster charging, you’ll need a Level 2 charger, which requires a 220- or 240-volt outlet.

The cost of installing a 240-volt outlet for an electric car averages between $175 and $300. Depending on the type of outlet as well as labor costs, you might pay as little as $130 or upwards of $400. Hiring a professional electrician makes up the bulk of the expense but ensures a safe and code-compliant installation.

Yes, you should get a quote or an estimate from an electrician. Most electricians offer free estimates or quotes. When getting quotes, do your research and verify each electrician’s license. Get quotes from three different electricians to compare. If the prices or items listed appear different on the quotes, ask the electrician to clarify. Learning as much as you can about the electrical work you want done will help you get the most accurate estimate. 

Hire an electrician the same way you would an employee. Ask questions and look for a good fit. Streamline the process by using these questions to ask an electrician. It's also common to ask for a quote in writing. Don’t forget to provide all the project details to ensure there are no surprises or opportunities for added fees.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Ledyard, CT homeowners’ guide to ev charger installation services

From average costs to expert advice, get all the answers you need to get your job done.