Top-rated excavation pros.

Get matched with top excavation pros in Saguache, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Saguache, CO?

Select your specific project to find the pro for you.

Find Excavation pros in Saguache

Avatar for Don Reboul Construction Company
Don Reboul Construction Company
3.7(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Saguache, CO and surrounding areas

In business since 1999

Free estimates

"These guys did an amazing job. Their work ethic is out of this world. Even when it came time for the cleanup they did not miss a beat. No nails or any debris let anywhere. I am talking about on the driveway, grass, yard, or even our neighbors yards. They were that thorough. I would give them a 10 out 10. These guys were very professional. I would recommend this company to all my friends and neighbors. Don was great to work with and I am referring him to all our friends and neighbors. 5 star rating!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by80%of homeowners
Physis Excavation, LLC
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Saguache, CO and surrounding areas

In business since 2023

Free estimates

Credit card accepted

Physis Excavation LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity, bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability, is what makes us true professionals. Above all, we are watchful of our customer's interests and make their concerns the basis of our business.

Response time5 hrs
Showing 1-10 of 18
Excavating questions, answered by experts

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

The Saguache, CO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.