Top-rated excavation pros.

Best excavation pros near Alamosa, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Alamosa, CO?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Alamosa - Updated Nov 2026

Avatar for Randy Robison
Randy Robison
New to Angi
Landscape - Minor Grading or Resloping

Serving Alamosa, CO and surrounding areas

Approved

Small jobs welcome

I'm capable and competent to take care of your needs. Also honest and reliable. Integrity is a top priority. \nI buy and sell and transport 20' shipping containers. I own a 15 yard dump trailer and a 5 yard dump trailer. I own a 20' equipment trailer. I own a 17' tow truck. I own a 20' gooseneck trailer. These assets are useful and ready to be used to get big projects done quickly. Big jobs and small jobs welcome. Handyman useful and efficient. Rate for 15-yard dump trailer $200 for delivery & pickup & up to a ton of trash with $10 per 100 lbs charge over 2000 lbs & $25 per day after 24 hours.

5 neighbors recently requested a quote
Showing 1-10 of 21
Excavating FAQs, answered by experts

Concrete blocks are the cheapest way to base a shed. However, the space in between allows critters to go under, burrow, and even damage your shed’s frame. For a more pest-proof option, consider building a shed base with gravel or paver stones. Both options are fairly affordable and easy enough for a DIY project. For gravel, you can build a wooden frame to contain the loose material.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Most residential basements are 8 to 10 feet deep. You can dig deeper depending on building codes, but it does become more difficult. You’ll likely need to install stronger foundation walls and additional supports to handle the increased load. Depending on the water table, you may also need a water management system. Clay soil can support a deeper foundation than sandy soil. A structural engineer will be able to tell you the maximum, feasible depth.

The easier way to find buried sprinkler lines is to use the plan from the professionals who installed the system. If you don’t have professional plans, listen for running water on your lawn when you turn on the system. You may also spot wet areas, giving you an idea of where the heads are. Once you find the sprinkler heads, you’ll likely be able to connect the dots between them, revealing the system below.

There is no standard depth for burying a septic tank; they are typically buried anywhere from 4 inches to 4 feet underground. The final depth depends on several factors, including the depth of your main sewer line, the height of the bedrock, soil type, local regulations, and the property's landscape. If you plan to grow grass or plants over the tank, a depth of at least 4 to 6 inches is recommended. Deeper tanks can be more difficult to locate, but a septic professional can help find it for you.

The Alamosa, CO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.