Top-rated excavation pros.

Get matched with top excavation pros in Del Norte, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Del Norte, CO?

Select your specific project to find the pro for you.

Find Excavation pros in Del Norte

Avatar for Randy Robison
Randy Robison
New to Angi
Landscape - Minor Grading or Resloping

Serving Del Norte, CO and surrounding areas

Approved

Small jobs welcome

I'm capable and competent to take care of your needs. Also honest and reliable. Integrity is a top priority. \nI buy and sell and transport 20' shipping containers. I own a 15 yard dump trailer and a 5 yard dump trailer. I own a 20' equipment trailer. I own a 17' tow truck. I own a 20' gooseneck trailer. These assets are useful and ready to be used to get big projects done quickly. Big jobs and small jobs welcome. Handyman useful and efficient. Rate for 15-yard dump trailer $200 for delivery & pickup & up to a ton of trash with $10 per 100 lbs charge over 2000 lbs & $25 per day after 24 hours.

5 neighbors recently requested a quote
Avatar for Don Reboul Construction Company
Don Reboul Construction Company
3.7(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Del Norte, CO and surrounding areas

In business since 1999

Free estimates

"These guys did an amazing job. Their work ethic is out of this world. Even when it came time for the cleanup they did not miss a beat. No nails or any debris let anywhere. I am talking about on the driveway, grass, yard, or even our neighbors yards. They were that thorough. I would give them a 10 out 10. These guys were very professional. I would recommend this company to all my friends and neighbors. Don was great to work with and I am referring him to all our friends and neighbors. 5 star rating!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by80%of homeowners
Physis Excavation, LLC
New to Angi
Building Site - Preparation and ClearingExcavation - Major Grading or ReslopingLandscape - Minor Grading or Resloping

Serving Del Norte, CO and surrounding areas

In business since 2023

Free estimates

Credit card accepted

Physis Excavation LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity, bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability, is what makes us true professionals. Above all, we are watchful of our customer's interests and make their concerns the basis of our business.

Response time5 hrs
Showing 1-10 of 21
Excavating questions, answered by experts

Above ground pools are not buried in the ground. Typically, above ground pools are semi-permanent. One reason they’re more affordable is that you don’t have to dig for an inground pool and pour concrete or another material. However, you can choose to install a semi inground pool, which is a hybrid between the two.

Underground downspouts refer to the sections of downspout extensions that lead away from your home and gutter system. While they cost more than traditional extensions, they can provide several benefits, such as less frequent damage and no need to move them for lawn care tasks. Whether they're worth it or not depends on your budget at installation time and how much convenience they'll add to your situation.

Downspouts should be buried at least 5 to 10 feet away from your foundation. This can vary depending on your local building codes, soil type, and property slope. The main goal is to ensure water is directed away from your foundation.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

The Del Norte, CO homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.