Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Parlier, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Parlier, CA?

Select your specific project to find the pro for you.

TRUSTED BY PARLIER, CA HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon44
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Parlier

Avatar for GBrooke construction llc
GBrooke construction llc
5.0(
6
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Parlier, CA and surrounding areas

Free estimates

Credit card accepted

Hi! We are GBrooke Construction LLC, we handle ALL of your home remodel or repair needs! \nWe do everything from small backyard home projects to building you a new home from scratch! Customer satisfaction and prideful work is our motivation! You dream it, we build it!

Sunrooms and Patio Enclosures Project
AFTER
Gazibo/deck
Garage and Shed Building Project
Portico build

+12

Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Parlier, CA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
DGM QUALITY POOLS, LLC
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Parlier, CA and surrounding areas

In business since 2023

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's custom needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Install Above Ground Pools questions, answered by experts

The disadvantages of container pools come down to flexibility and customization. Shipping containers come in standard sizes, so the sizes and shapes are limited. They also have a very distinctive look, which may not suit the aesthetic of your backyard. 

Beyond that, while container pools are more affordable than in-ground pools, certain models can be more expensive. This includes the cost to heat your pool, since the metal walls have more heat transfer than other types of pools (which some brands circumvent with insulation).

While you shouldn’t notice water that has an appropriate amount of chlorine in it (less than 4 parts per million), you could feel sick from drinking overly chlorinated water. Chlorine exposure can cause nausea, vomiting, coughing, and dizziness. Chronic chlorine exposure (meaning multiple or repeated instances) can make you feel like you have the flu, according to the CDC.

It can take anywhere from 12 to 24 hours to fill the average pool with water—and that’s if you use a couple of garden hoses. A water delivery service can fill your pool in one to three hours. Some services even pre-treat the water so it’s swim-ready as soon as it’s filled.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Concrete pools have the longest life span. As long as you properly maintain your concrete pool, you can expect it to last 50 to 100 years. That said, you will need to resurface your concrete pool as it ages. Fiberglass is durable, but fiberglass pools generally only last around 25 to 30 years. That said, some high-end fiberglass pools can last more than 50 years if they’re well-maintained.

The Parlier, CA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.