Top-rated rototilling pros.

Get matched with top rototilling pros in Georgetown, CA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Georgetown, CA?

Select your specific project to find the pro for you.

Find Rototilling pros in Georgetown

"Absolutely wonderful service. They were responsive, on time, thorough, friendly and very professional."

AUBREE F on May 2023

We are a small company specializing in all kinds of dirt work. Including land clearing, grading, trenching, debris removal, demolition, concrete removal, landscaping and much more. We get it right the first time.

"Absolutely wonderful service. They were responsive, on time, thorough, friendly and very professional."

AUBREE F on May 2023





New Vision Landscape

126 Cobble Ridge Dr
No reviews yet

New Vision Landscape

126 Cobble Ridge Dr
No reviews yet
15 years of experience

Small family owned and operated business that is committed to creating, beautifying and maintaining your home, office, and property. As a small business we have the luxury of personalizing and customizing your experience.

Small family owned and operated business that is committed to creating, beautifying and maintaining your home, office, and property. As a small business we have the luxury of personalizing and customizing your experience.






Showing 1-10 of 19
Rototilling questions, answered by experts

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

Typically 1-3 days, depending on property size and terrain condition.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Water pooling, uneven surfaces, or basement leaks are indicators.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"