Top-rated basement remodelers.

Get matched with top basement remodelers in Sedona, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Sedona, AZ?

Select your specific project to find the pro for you.

Find Basement remodelers in Sedona

Avatar for Phelps Precision Innovations, LLC
Phelps Precision Innovations, LLC
5.0(
25
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

Approved

In business since 1990

Free estimates

Warranties offered

"Phelps Precision Innovations was great to work with, communicated effectively, and delivered an excellent product, on time, and exceeded our expectations. We would definitely work with them again and refer them to others."
Bathroom #1
Bathroom #1
Master Bathroom
Bathroom #2
Master Bathroom

+33

18 neighbors recently requested a quote
Recommended by62%of homeowners
Avatar for Shepherd Contracting
Shepherd Contracting
5.0(
15
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Shepherd Contracting remodeled both of my bathrooms and installed new flooring throughout my entire house. Thomas was awesome! He was respectful, easy to work with, and offered way better pricing than other contractors I got estimates from, without compromising on quality. The work turned out 10/10, and I?ll definitely be using them again!"
My jobs
My jobs
My jobs
My jobs
My jobs

+40

5 neighbors recently requested a quote
Avatar for Bellco Construction LLC
Bellco Construction LLC
5.0(
5
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Yes, absolutely. On time, had excellent ideas and suggestions that enhanced the project. Highly knowledgeable about city codes, totally happy with the outcome and finished ahead of schedule."
Project Photos
6 neighbors recently requested a quote
Avatar for RJWC Development, LLC
RJWC Development, LLC
4.9(
8
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

Approved

In business since 2020

Free estimates

Warranties offered

"We had an outstanding experience remodeling our Sedona home with RJWC Development. Ryan and his team handled everything—permits, architectural design, and interior design—which made the entire process smooth and stress-free. They guided us every step of the way with professionalism, creativity, and clear communication. The result exceeded our expectations. If you’re looking for a contractor with a complete, turnkey approach, this is the one to call."
Response time1 day
8 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Ferguson Homes, LLC
Ferguson Homes, LLC
5.0(
2
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

Approved

In business since 1991

Free estimates

Offers commercial services

"He actually built a house for me. Did a great job and the house was completed in under a year, which is a record for this area. Very responsive to inquires and problems that do come up."
Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for JDS Improvements
JDS Improvements
4.4(
122
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"This company was recommended by our insurance co. and the property management co. I was very impressed with the work, the price, and the friendliness of the crew and owner. They worked with me to get the look I wanted and I'm thrilled with the outcome! Thanks, John!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+20

Recommended by94%of homeowners
J A U and Sons Inc
5.0(
4
)
Basement - Remodel

Serving Sedona, AZ and surrounding areas

In business since 2001

Free estimates

Offers commercial services

"We recently moved to the Verde Valley and purchased a 2000 vintage home. The home had never been updated at all and needed a complete face lift. We were told it would take a year or more to get that done considering the pool of available contractors. We're experienced with remodels and have done several on previous homes we've owned. We were introduced to John and his sons by another contractor. We gave them a chance to perform parts of the remodel as we already had contracts with the large box stores contractors. After watching the speed and efficiency of JAU we fired the other contractors and had them do our entire remodel. We were ahead of schedule and on budget the entire remodel. Any future remodel or construction job we plan will include John and his sons!"
Response time10 hrs
Recommended by100%of homeowners
Showing 1-10 of 30
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

The Sedona, AZ homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.