"I was very impressed with their skill level professionalism when I needed them. As with all of my projects, they have able to replace drywall and texture open walls in such a way that it appeared to part of seamless original design.
I would highly recommend them for any size project."
"Shepherd Contracting remodeled both of my bathrooms and installed new flooring throughout my entire house. Thomas was awesome! He was respectful, easy to work with, and offered way better pricing than other contractors I got estimates from, without compromising on quality. The work turned out 10/10, and I?ll definitely be using them again!"
"Jeff was a true professional from the moment we spoke. He’s honest and fair in his pricing. His quote to replace my vanity and fix my bathroom shower were exactly what I was looking for. Jeff was reliable and showed up when he said he would and gave me ideas on how to improve and better utilize the space I was working with. I can’t recommend him enough to anyone done with contractors who overcharge and who take forever to get the job done. I will definitely call Jeff again when I am ready to remodel my kitchen."
"This company was recommended by our insurance co. and the property management co. I was very impressed with the work, the price, and the friendliness of the crew and owner. They worked with me to get the look I wanted and I'm thrilled with the outcome! Thanks, John!"
"Amanda was really very good! At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it. It was very clear that she knew her business and she gave me several ideas that I had not even thought about. I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!
With several years experience, we work hard to bring each customer the best possible service and quality available. We look forward to working with you on your next project. We welcome your questions and thank you for your interest.
Remodeling business locally owned and operated we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!\n\nService Trip $100 automatically deducted from your total
We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!\n\n
The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.
While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.
There are several small, inexpensive upgrades you can make to upgrade your basement. Although you still need to adhere to building codes and obtain permits when necessary, you can complete small but mighty tasks like painting the masonry walls and installing entertainment devices to make the space more usable.
Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.
The difficulty of adding a basement to an existing house can vary depending on the house’s location, the size of the basement, and the type and condition of the existing foundation. Adding a basement is a job best handled by the pros, so you’ll need to enlist professional help for this project.
The Leupp, AZ homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.