Top-rated solar panel pros.

Get matched with top solar panel pros in Pinon, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Pinon, AZ?

Select your specific project to find the pro for you.

Find Solar panel pros in Pinon

Avatar for Sunshine Experts,llc
Sunshine Experts,llc
4.7(
179
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Pinon, AZ and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"Our main installer was Jesus, and he carefully explained each step of the work and then went over all the information we would need to know. We are very happy with all three items, saving electricity with the SolaTube as we no longer have to turn lights on during the day in our Master bath dressing area, we hope that the Solar attic fan is helping to keep the house cooler by exchanging the air in the attic when it gets hot. In our small home office we replaced an old skylight with new double glass skylight with a shade system and this has made a big difference in the office. Sunshine Experts, LLC did a great job for us and we are very happy to recommend them when anyone asks us about our experience."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+20

Recommended by96%of homeowners
Avatar for Choice Home Warranty
Choice Home Warranty
4.0(
5,678
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Pinon, AZ and surrounding areas

In business since 2008

Emergency services offered

Credit card accepted

"They recommended that we replace the dryer as the cost to repair were higher than the allowed limit. The dryer needed heating element and control panel. We are supposed to receive a LOWES gift card within 30 days to replace the dryer. I am satisfied with the recommendation, however 30 days is a long time to be without my dryer. Hopefully the gift card will arrive earlier so that I can replace the dryer in a timely manner."
Recommended by81%of homeowners
Avatar for National Property Inspections
National Property Inspections
4.7(
7
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Pinon, AZ and surrounding areas

In business since 2006

Free estimates

Emergency services offered

2012 Maricopa Business of the Year. Arizona's premier home inspection company. Thermal imaging certified, no extra charges for pools. Statewide service. We schedule termite Inspections as part of our Inspections. A Rated BBB. 6 month warranty included with every inspection. 7 day per week service. \nwww.arizonainspections.com\nOffice 520-208-2590

NPI- Experience the Difference
Recommended by85%of homeowners
Solar Panels questions, answered by experts

The average homeowner needs around 22 solar panels, but the exact number depends on your monthly energy consumption. Your solar professional should size your array to offset your consumption, meaning you’ll need fewer panels if you use below-average amounts of electricity, or more than 22 if you use above-average amounts of electricity. The number of panels also depends on the output of each panel. The average is around 400 watts, but you might need more panels if you install less capable equipment. Since there are so many variables, you should have a professional size your system.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

Solar panels can protect your roof from hail, as they can withstand hail up to 1 inch in diameter that falls up to 50 mph. Your solar panels may experience damage if the hailstones are bigger and travel faster. Your roof can still suffer hail damage, and it’s essential to look for signs and repair issues right away. Roof damage can lead to leaks and water damage inside your home.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

Depending on the climate in your area, the best time to install solar panels is either winter or early spring. Summer is a fine time to install panels, too, but it tends to be the busy season, so prices may be higher and companies may have packed schedules. The installation process can take more time than expected between getting permits and finalizing a design, so start as soon as you can.

The Pinon, AZ homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.