Top-rated solar panel pros.

Get matched with top solar panel pros in First Mesa, AZ

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in First Mesa, AZ?

Select your specific project to find the pro for you.

Find Solar panel pros in First Mesa

Avatar for EPC Solar LLC
EPC Solar LLC
5.0(
29
)

Serving First Mesa, AZ and surrounding areas

In business since 2023

Free estimates

Warranties offered

"EPC Solar did an outstanding job with my solar panel installation. They approached the project with expertise and professionalism, ensuring everything was installed efficiently. I'm thrilled with the performance and the savings I'm already seeing!"
Pinetop Roof Mount
Racking for Pinetop
Phx Shade Canopy
Phx Shade Canopy
Response time3 hrs
Response rate100%
Recommended by75%of homeowners
Avatar for R&J Solar LLC
R&J Solar LLC
5.0(
2
)

Serving First Mesa, AZ and surrounding areas

In business since 2022

Free estimates

Credit card accepted

We provide residential and commercial solar power options, and provide support services for industry partner companies. We offer no cost consultations and $0 down financing. Please contact our office for a consultation at (931)922-8258.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Avatar for Choice Home Warranty
Choice Home Warranty
4.0(
5,677
)

Serving First Mesa, AZ and surrounding areas

In business since 2008

Emergency services offered

Credit card accepted

"They recommended that we replace the dryer as the cost to repair were higher than the allowed limit. The dryer needed heating element and control panel. We are supposed to receive a LOWES gift card within 30 days to replace the dryer. I am satisfied with the recommendation, however 30 days is a long time to be without my dryer. Hopefully the gift card will arrive earlier so that I can replace the dryer in a timely manner."
Recommended by82%of homeowners
Avatar for National Property Inspections
National Property Inspections
4.7(
7
)

Serving First Mesa, AZ and surrounding areas

In business since 2006

Free estimates

Emergency services offered

2012 Maricopa Business of the Year. Arizona's premier home inspection company. Thermal imaging certified, no extra charges for pools. Statewide service. We schedule termite Inspections as part of our Inspections. A Rated BBB. 6 month warranty included with every inspection. 7 day per week service. \nwww.arizonainspections.com\nOffice 520-208-2590

NPI- Experience the Difference
Recommended by85%of homeowners
Solar Panels questions, answered by experts

In most cases, installing solar panels will not void your roof warranty. To keep roof warranties intact, check your written warranty or call the manufacturer to ask about clauses regarding roof penetrations. You can also protect yourself by getting written approval or a modified warranty that specifically allows the solar installation type you’re planning. Then, hire a professional solar installer that follows roofing manufacturer instructions and protects the roof during installation.

No, you cannot turn on a new solar system before inspection. The inspector checks that the system is correctly connected to the grid and that safety components and features are in place. This process prevents problems on the electrical grid and offers protection against fire in your home. 

Your local utility company may also require inspection documentation before you can connect to the grid. An inspection can ensure solar power efficiency and determine how you might increase it.

Yes, you can connect an inverter directly to your solar panels without solar battery storage if your home is connected to the power grid. However, most pros don’t recommend a direct connection because solar panels don’t put out steady voltage. It’s always best to install a charge controller between your solar panel and your inverter to regulate the flow of energy and ensure a stable power supply.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

You can start narrowing your search for a reputable solar company by finding local, regional, and national companies that service your area and maintain positive reviews online. You should also check the Better Business Bureau’s (BBB) website to see if the company has complaints filed against them. Next, contact the remaining candidates and ask about installation timelines, warranty coverage, and financing options. Choose a company that offers a labor warranty that lasts at least 10 years and prioritizes cash purchases and solar loans.

The First Mesa, AZ homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.