Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in White Hall, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in White Hall, AR?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in White Hall

Avatar for Plan A Brick And Stone
Plan A Brick And Stone
5.0(
9
)

Serving White Hall, AR and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

"Markus Perry did a really good job. He was punctual, gave me a good price, and did a really good job. I would highly recommend him to anyone needing masonry work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+30

Response time2 days
Response rate100%
3 neighbors recently requested a quote
Avatar for Groundworks
Groundworks
5.0(
9
)

Serving White Hall, AR and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Warranties offered

"We had the opportunity to meet Bobby Dugger, AND look at our problems and he and partner went straight to work assessing the job , They both were VERY professional and Informative, Explained everything and even found things we knew nothing about, I'm sure we will be PLEASED with the finished work, I would definitely recommend them. Very professional at what he does, THANK YOU GROUND WORKS."
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Basement Waterproofing
Concrete

+15

116 neighbors recently requested a quote
MH CONCRETE FINISHING & CONSTRUCTION
New to Angi

Serving White Hall, AR and surrounding areas

In business since 2015

Free estimates

Emergency services offered

MH CONCRETE FINISHING & CONSTRUCTION,LLC.- PRESIDEN is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Concrete Mudjacking questions, answered by experts

On average, a mudjacking repair lasts between five and 10 years, though it can sometimes last for well beyond a decade under ideal conditions. Its longevity depends heavily on several factors, including the condition of the underlying soil, environmental conditions like freeze/thaw cycles and erosion, and whether the root cause of the sinking, such as drainage issues, is resolved. Because it doesn't always fix the underlying problem of loose soil, mudjacking is often considered a temporary solution. Proper maintenance and evaluation can help extend its lifespan.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The White Hall, AR homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.