Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Fordyce, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Fordyce, AR?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Fordyce

Avatar for Home Services Foundation Repair
Home Services Foundation Repair
4.9(
9
)

Serving Fordyce, AR and surrounding areas

Approved

In business since 1999

Free estimates

Emergency services offered

"Mr. Bradshaw came out and inspected the problem I thought I might have but I was not sure. Mr. Bradshaw could have sold me a job easily, but he was honest and told me the problem was not a problem at all. He spent time with me looking at the basement and I could not be happier with his company.... honest and punctual and just a very good company. I recommend them highly."
French Drain Installation
Drain at church
Drain installation
drain installation
drain installation

+43

Response time1 day
Response rate100%
120 neighbors recently requested a quote
Avatar for Tony's Paving
Tony's Paving
5.0(
2
)

Serving Fordyce, AR and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I’ve hired Tonys Paving on numerous occasions! Tony and his crew is a great company, they do exactly what they say they’ll do. I will definitely hire them again when the necessity arises!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by100%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Common issues with concrete that may require professional repair or resurfacing include cracks, spalling, uneven surfaces, and weather damage.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

It restores concrete, prevents replacement cost disruptions, reduces trip hazards, and provides stability at a lower cost.

The Fordyce, AR homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.